JCB 50Z
  • +1 Images

JCB 50Z

0(0 Reviews)

JCB 50Z is available in the India market with an ex-showroom price of . JCB 50Z comes with 48 HP,0.14 cu.m - 0.22 cu.m,143 Nm,76 Ltr.

Price coming soon*

View Price Breakup

EMI starts @

*****/month*

Ex-showroom price in

EMI starts @

*****/month*

JCB 50Z Construction Equipments Specs & Features

  • 48 HP
    Power
  • 0.14 cu.m - 0.22 cu.m
    Bucket Capacity
  • 143 Nm
    Maximum Torque
  • 76 Ltr
    Fuel Tank Capacity

JCB 50Z Latest Update

JCB 50Z is a compact excavator that has been built to cater to the challenging needs of the urban landscape of India. It is capable of handling numerous applications like planting, pipe laying, narrow drainage cleaning, canals sediment removal, trenching work, railway cable laying and utility work in industrial plants etc. Its compact size, zero tail swing, high-end structural stability, 8 operating modes, auto idle & one touch idle, intelligent display with dial type throttle control and advanced LiveLink, make it a perfect partner for multiple industries.

JCB 50Z Construction Equipments Overview

JCB 50Z Construction Equipments Engine

JCB 50Z is powered by 48 HP , 0.14 cu.m - 0.22 cu.m , 143 Nm and 76 Ltr

JCB 50Z Latest Price in India 2025

JCB 50Z is available in India starting from 0

JCB 50Z Alternatives & Competitors

Main rival Construction Equipments of JCB 50Z are ACE AX-130, JCB 4DX, ACE AX-124, ACE AX-124 NS, BOBCAT B900 and JCB 3DX Plus

Keep reading to explore more about JCB 50Z's updated specs, latest prices, horsepower, genuine user reviews, exclusive images, best offers near you, Construction Equipments dealers.

JCB 50Z Variant Price Range
Base

JCB 50Z Price List Variants

JCB 50Z Images

  • JCB 50Z

JCB 50Z Specifications

  • Engine
  • Hydraulic system
  • General
  • Dimensions
  • Swing Mechanism
  • Weights
  • Working Ranges & Forces
  • Service Refill Capacities
Engine
Net Power Iso 924948 HP
Hydraulic system
Main Maximum Flow90
General
CategoryExcavator
Sub CategoryMini
Power48 HP
Weight Ground Cleaner618
Dimensions
Ground Clearance300
Track Gauge1.55
Counterweight Clearance618
Tail Swing Radius975
Track Length1990
Bucket Capacity0.14 cu.m - 0.22 cu.m
Swing Mechanism
Maximum Torque143 Nm
Weights
Fuel Tank Capacity76Ltr
Engine Oil9.1
Hydraulic Including Tank100
Working Ranges & Forces
Maximum Digging Depth3650
Service Refill Capacities
Hydraulic100 Ltr

Compare JCB 50Z with Competitors

JCB 50Z User Reviews

JCB 50Z User Review

Be The First to Rate

      Have a question in your mind about JCB 50Z ?

      Get your answer from expert and users

        JCB 50Z Brochure

        Download JCB 50Z Brochure to check more details.

        Explore More Options

        Latest News

        • Telangana Seeks Fast Approval for RRR, Amaravati ExpresswayIn a decisive move underscoring Telangana's infrastructure ambitions, the state government has intensified its appeal to the Centre for expeditious clearance of two transformative road projects — the Regional Ring Road (RRR) and the Hyderabad-Amarava...
          BS

          By Bharat

          Wed Jun 25 2025

          5 min read
        • Mumbai-Goa Highway to Be Finished by June 2025The long-standing infrastructure endeavour known as the Mumbai-Goa Highway is poised for completion by June 2025, ushering in a new era of regional integration and economic acceleration along India’s western coastline. With several critical segments...
          BS

          By Bharat

          Tue Jun 24 2025

          3 min read
        • Delhi-Mumbai Expressway's 8-Lane Tunnel Nears CompletionThe Delhi-Mumbai Expressway is close to marking a major achievement with the upcoming completion of its 8-lane tunnel. Built near Sohna in Haryana, this tunnel is set to become the widest road tunnel in India, forming a vital segment of the Delhi Exp...
          BS

          By Bharat

          Mon Jun 23 2025

          3 min read
        • Gorakhpur Link Expressway Opens: Faster, Smoother Travel BeginsA Landmark Milestone in Eastern UP’s Road InfrastructureWith a formal inauguration on June 20, 2025, the long-anticipated Gorakhpur Link Expressway has finally opened to the public. This 91.35 km marvel of engineering is not just a road; it is a life...
          BS

          By Bharat

          Fri Jun 20 2025

          6 min read
        • Delhi-Jaipur Expressway: A New Era of ConnectivityIn the ever-evolving narrative of India's infrastructure advancement, the Delhi-Jaipur Expressway emerges not merely as a road but as a transformative force reshaping connectivity, commerce, and the future of regional development. A strategic segment...
          BS

          By Bharat

          Thu Jun 19 2025

          3 min read
        • Expressways in India: Completed, Ongoing & Upcoming ProjectsIndia is witnessing a rapid transformation in its road infrastructure with the development of high-speed expressways connecting key cities and industrial corridors. These access-controlled highways are designed to boost connectivity, reduce travel ti...
          PV

          By Pratham

          Tue Jun 17 2025

          4 min read
        • Varanasi–Ranchi–Kolkata Expressway: All Villages & Route Details RevealedA Seamless Link from Varanasi to Kolkata via Ranchi Now Taking ShapeThe Varanasi–Ranchi–Kolkata Expressway — also known as the Varanasi–Kolkata Expressway — is a major greenfield project under the Government of India’s ambitious Bharatmala Pariyojna....
          PV

          By Pratham

          Mon Jun 16 2025

          5 min read
        • Delhi-Mumbai Expressway Delay: Completion Expected in 2027IntroductionThe Delhi-Mumbai Expressway, India’s longest expressway under development, will take two more years to complete. The original deadline, March 2024, shifted earlier to October 2025, but current progress suggests final completion may not ha...
          PV

          By Pratham

          Fri Jun 13 2025

          3 min read
        • 701 Km Samruddhi Expressway Nears Completion, Final Stretch ReadyIntroductionThe Samruddhi Expressway, now fully connected, links Mumbai to Nagpur through a 701-kilometre high-speed corridor. The last 76-km section, between Igatpuri and Amane, is now operational—marking the project's completion.Final Section: Buil...
          PV

          By Pratham

          Thu Jun 12 2025

          3 min read
        • Yamuna Expressway: Features, Tolls, and Top Travel TipsThe Yamuna Expressway, also known as the Taj Expressway, is a 165.5-kilometre-long, six-lane (expandable to eight) access-controlled expressway connecting Pari Chowk in Greater Noida to Kuberpur near Agra. Since its inauguration on 9 August 2012, the...
          PV

          By Pratham

          Thu Jun 12 2025

          4 min read
        Latest News
        *Prices are indicative and subject to change.
        91Infra

        91Infra is a rapidly growing digital platform that provides the latest updates and detailed information about the infrastructure and construction equipment industry.

        Our Partner Website

        Get Connected