JCB 4DX
  • +1 Images

JCB 4DX

4.8(1 Reviews)

JCB 4DX is available in the India market with an ex-showroom price of ₹36.00 Lakh. JCB 4DX comes with 74 HP,0.32 cu.m - 0.4 cu.m,400 Nm.

₹36.00 Lakh*

View Price Breakup

EMI starts @

₹67,257/Month*

Ex-showroom price in

JCB 4DX

EMI starts @

₹67,257/Month*

  • 4DX
  • Price
  • Variants
  • Images
  • Specs
  • Reviews
  • Q&A
  • Videos
  • EMI
  • Brochure

JCB 4DX Construction Equipments Specs & Features

  • 74 HP
    Power
  • 0.32 cu.m - 0.4 cu.m
    Bucket Capacity
  • 400 Nm
    Maximum Torque

JCB 4DX Latest Update

JCB, a leading manufacturer of construction equipment, offers the 4DX as a powerful and versatile backhoe loader designed for heavy-duty applications. The JCB 4DX is likely a more recent addition to their backhoe loader range, aimed at tackling large-scale construction projects. It builds upon the success of the JCB 3DX, offering increased power, capacity, and capabilities.

Read More

JCB 4DX Price List Variants

JCB 4DX Images

  • JCB 4DX

    JCB 4DX

JCB 4DX Specifications

  • Engine
  • Loader General Dimension
  • Backhoe Loader Dimension
  • Overall Dimension & Weight
  • Hydraulic system
  • Service Capacities
  • Steering
  • Brakes
  • Tyre
  • General
  • Dimensions
  • Swing Mechanism
Engine
ModelJCB 444
CompliantCEV Stage lV Engine
Gross Power55kW (74hp) @ 2200 rpm
Loader General Dimension
Dump Height2930 MM
Load Over Height3370
Hinge Pin Height3640
Reach At Ground1600 MM
Max Reach At Full Height1240 MM
Max Reach At Full Height Bucket Dumped930
Below Ground Level Dig Depth130
Rollback At Ground43 Deg
Dump Angle41 Deg
Bucket Capacity Std1.2
Loader Arm Breakout Force5516 kgf
Max Pay Load1800
Maximum Lifting Capacity3050
Backhoe Loader Dimension
Max Dig Depth5360
Reach Ground Level To Swing Center6380
Reach Ground Level To Rear Wheel Center7570
Reach At Full Height To Slew Center2180
Max Working Height6250
Max Load Over Height3960
Bucket Rotation185 deg
Bucket Breakout Force6716
Dipper Tear Out Force4551
Max Lift Capacity2547
Overall Dimension & Weight
Max Operating Weight8470
Transport Length6350
Width Over Bucket2440 MM
Track Width Rear1730 MM
Track Width Front1910 MM
Minimum Ground Clearance280 mm
Height To Top Of Cabin2870 MM
Overall Transport Height4200
Hydraulic system
Pump Flow154 Lpm
Service Capacities
Rear Axle20 Ltr
Hydraulic Oil115
Transmission Oil Capacity17.5 Ltr
Steering
Turning Circle Diameter Outside Bucket10200
Turning Circle Diameter Outside Bucket Not Braked11700
Brakes
ServiceJCB ‘Q’ brakes, hydraulically actuated, dual line, self adjusting (compensated), oil immersed, multi-disc type on the rear axle, well protected from dirt, water, requiring no maintenance.Through indep
ParkingHand operated, disc brakes on rear axle input disc.
Tyre
Standard Front9 x16 -1 6PR
Standard Rear16.9 x 28 -12PR
General
CategoryBackhoe Loader
Power74 HP
Dimensions
Bucket Capacity0.32 cu.m - 0.4 cu.m
Swing Mechanism
Maximum Torque400 Nm

JCB 4DX Detailed Overview

  • Engine

  • Lifting Capacity

Compare JCB 4DX with Competitors

JCB 4DX User Reviews

JCB 4DX User Review
4.8(1 reviews)
      Have a question in your mind about JCB 4DX ?

      Get your answer from expert and users

      QNA
      • Is the JCB 4DX fuel-efficient?
        • It offers improved fuel efficiency compared to older models, but heavy use can still lead to significant fuel consumption.
          GS

          Gaurav Sharma

          02 Jul 2024

      • What kind of maintenance does the JCB 4DX require?
        • Regular maintenance includes checking hydraulic systems, engine oil levels, and filters. Advanced features may require specialized servicing.
          GS

          Gaurav Sharma

          02 Jul 2024

      • How does the JCB 4DX compare to other backhoe loaders?
        • It stands out due to its advanced features, operator comfort, and robust performance, although it is often more expensive than its competitors.
          GS

          Gaurav Sharma

          02 Jul 2024

      • What are the primary applications of the JCB 4DX?
        • It is widely used for construction, excavation, landscaping, and agricultural tasks.
          GS

          Gaurav Sharma

          02 Jul 2024

      JCB 4DX EMI Calculator

      EMI ₹67,257 per month

      Loan Amount

      Interest Amount

      0

      ₹36,00,000

      7%

      18%

      Time Period (in years)

      1 year

      7 year

      ₹32,40,000

      ₹7,95,424

      ₹40,35,424

      EMI starting at

      ₹67,257 /month*

      JCB 4DX Brochure

      Download JCB 4DX Brochure to check more details.

      Explore More Options

      • Dealers

        Connect with trusted dealers for the best offers

      • Comparison

        Compare vehicle side by side and choose the best

      Latest News

      • Telangana Seeks Fast Approval for RRR, Amaravati Expressway
        Telangana Seeks Fast Approval for RRR, Amaravati ExpresswayIn a decisive move underscoring Telangana's infrastructure ambitions, the state government has intensified its appeal to the Centre for expeditious clearance of two transformative road projects — the Regional Ring Road (RRR) and the Hyderabad-Amarava...
        BS

        By Bharat

        Wed Jun 25 2025

        5 min read
      • Mumbai-Goa Highway to Be Finished by June 2025
        Mumbai-Goa Highway to Be Finished by June 2025The long-standing infrastructure endeavour known as the Mumbai-Goa Highway is poised for completion by June 2025, ushering in a new era of regional integration and economic acceleration along India’s western coastline. With several critical segments...
        BS

        By Bharat

        Tue Jun 24 2025

        3 min read
      • Delhi-Mumbai Expressway's 8-Lane Tunnel Nears Completion
        Delhi-Mumbai Expressway's 8-Lane Tunnel Nears CompletionThe Delhi-Mumbai Expressway is close to marking a major achievement with the upcoming completion of its 8-lane tunnel. Built near Sohna in Haryana, this tunnel is set to become the widest road tunnel in India, forming a vital segment of the Delhi Exp...
        BS

        By Bharat

        Mon Jun 23 2025

        3 min read
      • Gorakhpur Link Expressway Opens: Faster, Smoother Travel Begins
        Gorakhpur Link Expressway Opens: Faster, Smoother Travel BeginsA Landmark Milestone in Eastern UP’s Road InfrastructureWith a formal inauguration on June 20, 2025, the long-anticipated Gorakhpur Link Expressway has finally opened to the public. This 91.35 km marvel of engineering is not just a road; it is a life...
        BS

        By Bharat

        Fri Jun 20 2025

        6 min read
      • Delhi-Jaipur Expressway: A New Era of Connectivity
        Delhi-Jaipur Expressway: A New Era of ConnectivityIn the ever-evolving narrative of India's infrastructure advancement, the Delhi-Jaipur Expressway emerges not merely as a road but as a transformative force reshaping connectivity, commerce, and the future of regional development. A strategic segment...
        BS

        By Bharat

        Thu Jun 19 2025

        3 min read
      • Expressways in India: Completed, Ongoing & Upcoming Projects
        Expressways in India: Completed, Ongoing & Upcoming ProjectsIndia is witnessing a rapid transformation in its road infrastructure with the development of high-speed expressways connecting key cities and industrial corridors. These access-controlled highways are designed to boost connectivity, reduce travel ti...
        PV

        By Pratham

        Tue Jun 17 2025

        4 min read
      • Varanasi–Ranchi–Kolkata Expressway: All Villages & Route Details Revealed
        Varanasi–Ranchi–Kolkata Expressway: All Villages & Route Details RevealedA Seamless Link from Varanasi to Kolkata via Ranchi Now Taking ShapeThe Varanasi–Ranchi–Kolkata Expressway — also known as the Varanasi–Kolkata Expressway — is a major greenfield project under the Government of India’s ambitious Bharatmala Pariyojna....
        PV

        By Pratham

        Mon Jun 16 2025

        5 min read
      • Delhi-Mumbai Expressway Delay: Completion Expected in 2027
        Delhi-Mumbai Expressway Delay: Completion Expected in 2027IntroductionThe Delhi-Mumbai Expressway, India’s longest expressway under development, will take two more years to complete. The original deadline, March 2024, shifted earlier to October 2025, but current progress suggests final completion may not ha...
        PV

        By Pratham

        Fri Jun 13 2025

        3 min read
      • 701 Km Samruddhi Expressway Nears Completion, Final Stretch Ready
        701 Km Samruddhi Expressway Nears Completion, Final Stretch ReadyIntroductionThe Samruddhi Expressway, now fully connected, links Mumbai to Nagpur through a 701-kilometre high-speed corridor. The last 76-km section, between Igatpuri and Amane, is now operational—marking the project's completion.Final Section: Buil...
        PV

        By Pratham

        Thu Jun 12 2025

        3 min read
      • Yamuna Expressway: Features, Tolls, and Top Travel Tips
        Yamuna Expressway: Features, Tolls, and Top Travel TipsThe Yamuna Expressway, also known as the Taj Expressway, is a 165.5-kilometre-long, six-lane (expandable to eight) access-controlled expressway connecting Pari Chowk in Greater Noida to Kuberpur near Agra. Since its inauguration on 9 August 2012, the...
        PV

        By Pratham

        Thu Jun 12 2025

        4 min read
      Latest News
      *Prices are indicative and subject to change.
      91Infra

      91Infra is a rapidly growing digital platform that provides the latest updates and detailed information about the infrastructure and construction equipment industry.

      Our Partner Website

      91trucks.com
      91tractors.com
      Get Connected