ACE AX-124
  • +2 Images

ACE AX-124

4.5(3 Reviews)

ACE AX-124 is available in the India market with an ex-showroom price of ₹23.00 Lakh. ACE AX-124 comes with 300 NM,0.24.

₹23.00 Lakh*

View Price Breakup

EMI starts @

₹42,970/Month*

Ex-showroom price in

ACE AX-124

EMI starts @

₹42,970/Month*

  • AX-124
  • Price
  • Variants
  • Images
  • Specs
  • Reviews
  • Q&A
  • Videos
  • EMI
  • Brochure

ACE AX-124 Construction Equipments Specs & Features

  • 300 NM
    Maximum Torque
  • 0.24
    Bucket Capacity

ACE AX-124 Latest Update

The ACE AX-124-NS is a backhoe loader from Action Construction Equipment Ltd., designed to cater to the demanding needs of construction and agricultural sectors.

Read More

ACE AX-124 Construction Equipments Overview

ACE AX-124 Construction Equipments Engine

ACE AX-124 is powered by 300 NM and 0.24

ACE AX-124 Latest Price in India 2025

ACE AX-124 is available in India starting from ₹23.00 Lakh

ACE AX-124 Alternatives & Competitors

Main rival Construction Equipments of ACE AX-124 are ESCORTS HYDRA 14, Schwing Stetter XGC85 Crane, Schwing Stetter XS115H Compactor, Schwing Stetter ZL33FV Wheeled Loader, Schwing Stetter GTBZ18A1 Boomlift and CAT 424

Keep reading to explore more about ACE AX-124's updated specs, latest prices, horsepower, genuine user reviews, exclusive images, best offers near you, Construction Equipments dealers.

ACE AX-124 Variant Price Range
Base ₹23.00 Lakh

Read More

ACE AX-124 Price List Variants

ACE AX-124 Images

  • ACE AX-124

    ACE AX-124

  • ACE AX-124

    ACE AX-124

ACE AX-124 Specifications

  • Engine
  • Loader General Dimension
  • Backhoe Loader Dimension
  • Overall Dimension & Weight
  • Hydraulic system
  • Service Capacities
  • Axle
  • Steering
  • Tyre
  • Electrical System
  • General
Engine
ModelKIRLOSKAR 4R1190NA1
CompliantBS-IV
Gross Power74 hp
Maximum Torque300 NM
Loader General Dimension
Dump Height2760 MM
Load Over Height3340 MM
Hinge Pin Forward Reach430
Reach At Ground1770 MM
Max Reach At Full Height Bucket Dumped1220
Below Ground Level Dig Depth7654
Rollback At Ground44 Deg
Dump Angle45 Deg
Bucket Capacity Std1.1
Loader Arm Breakout Force4950 Kgf
Max Pay Load1900 kg
Backhoe Loader Dimension
Max Dig Depth4250 MM
Reach Ground Level To Swing Center5500
Reach At Full Height To Slew Center2780 MM
Max Working Height5470 MM
Max Load Over Height3340 MM
Bucket Capacity0.24
Bucket Capacity Backhoe0.2
Bucket Rotation175 Degree
Dipper Tear Out Force4000 Kgf
Max Lift Capacity1900
Safe Working Load1100 kg
Overall Dimension & Weight
Max Operating Weight8040
Width Over Bucket2500 MM
Track Width Rear1550 MM
Track Width Front1840 MM
Wheelbase2180 MM
Minimum Ground Clearance350 MM
Hydraulic system
Pump Flow118 IPM
Relief Pressure210 Bar
Service Capacities
Engine Oil11 L
Rear AxleFront Drive( In Case Of 4 Wd & Steer Axle Centrally Pivoted Rear: Rigid Axle With Carraro Planetary
Fuel Tank150 ltrs
Hydraulic Oil80
Transmission Oil Capacity17 Ltr
Axle
RearRigid axle with CARRARO planetary drive
FrontDrive & Steer Axle, centrally pivoted
Steering
TypeHydrostatic steering for reliability and better control
Tyre
Standard Front9.00 x 16 – 16 PR
Standard Rear16.90 - 28 - 12 PR
Electrical System
Battery12 V
General
CategoryBackhoe Loader

Compare ACE AX-124 with Competitors

ACE AX-124 User Reviews

ACE AX-124 User Review
4.5(3 reviews)
  • Performance
    5.0
  • Durability
    5.0
  • Features
    5.0
  • Safety

    Safely and smoothly handles even tough jobs.

    A

    Anonymous

    Mar 27, 2025

  • Strong

    This backhoe loader uses less fuel, allowing me to work for a long time. The ACE AX-124 can save money on fuel easily due to its large fuel tank.

    A

    Anonymous

    Mar 27, 2025

View More Review
Have a question in your mind about ACE AX-124 ?

Get your answer from expert and users

QNA
  • What are the key features of the ACE AX-124-NS?
    • Key features include a 74 HP engine, 2760 mm dump height, 4250 mm max dig depth, 1 cubic meter bucket capacity, and 8040 Kg operating weight
      GS

      Gaurav Sharma

      03 Jul 2024

  • What is the operating weight of the ACE AX-124-NS?
    • The operating weight of the ACE AX-124-NS is 8040 Kg.
      GS

      Gaurav Sharma

      03 Jul 2024

  • What is the price range of the ACE AX-124-NS?
    • The ACE AX-124-NS is priced between ₹23 lakh and ₹31 lakh in India.
      GS

      Gaurav Sharma

      03 Jul 2024

Pros & Cons of ACE AX-124

Features we admire in ACE AX-124

  • The AX-124-NS is noted for its large fuel tank and efficient engine, which reduce the need for frequent refueling and lower overall fuel costs.
  • The powerful engine and strong hydraulic system enable it to handle tough jobs effectively.
  • Designed with a comfortable seat and excellent visibility, enhancing safety and efficiency.
  • Competitive pricing and cost-saving features make it a valuable investment for various construction projects

ACE AX-124 EMI Calculator

EMI ₹42,970 per month

Loan Amount

Interest Amount

0

₹23,00,000

7%

18%

Time Period (in years)

1 year

7 year

₹20,70,000

₹5,08,188

₹25,78,188

EMI starting at

₹42,970 /month*

ACE AX-124 Brochure

Download ACE AX-124 Brochure to check more details.

Explore More Options

  • Dealers

    Connect with trusted dealers for the best offers

  • Comparison

    Compare vehicle side by side and choose the best

Latest News

  • Telangana Seeks Fast Approval for RRR, Amaravati Expressway
    Telangana Seeks Fast Approval for RRR, Amaravati ExpresswayIn a decisive move underscoring Telangana's infrastructure ambitions, the state government has intensified its appeal to the Centre for expeditious clearance of two transformative road projects — the Regional Ring Road (RRR) and the Hyderabad-Amarava...
    BS

    By Bharat

    Wed Jun 25 2025

    5 min read
  • Mumbai-Goa Highway to Be Finished by June 2025
    Mumbai-Goa Highway to Be Finished by June 2025The long-standing infrastructure endeavour known as the Mumbai-Goa Highway is poised for completion by June 2025, ushering in a new era of regional integration and economic acceleration along India’s western coastline. With several critical segments...
    BS

    By Bharat

    Tue Jun 24 2025

    3 min read
  • Delhi-Mumbai Expressway's 8-Lane Tunnel Nears Completion
    Delhi-Mumbai Expressway's 8-Lane Tunnel Nears CompletionThe Delhi-Mumbai Expressway is close to marking a major achievement with the upcoming completion of its 8-lane tunnel. Built near Sohna in Haryana, this tunnel is set to become the widest road tunnel in India, forming a vital segment of the Delhi Exp...
    BS

    By Bharat

    Mon Jun 23 2025

    3 min read
  • Gorakhpur Link Expressway Opens: Faster, Smoother Travel Begins
    Gorakhpur Link Expressway Opens: Faster, Smoother Travel BeginsA Landmark Milestone in Eastern UP’s Road InfrastructureWith a formal inauguration on June 20, 2025, the long-anticipated Gorakhpur Link Expressway has finally opened to the public. This 91.35 km marvel of engineering is not just a road; it is a life...
    BS

    By Bharat

    Fri Jun 20 2025

    6 min read
  • Delhi-Jaipur Expressway: A New Era of Connectivity
    Delhi-Jaipur Expressway: A New Era of ConnectivityIn the ever-evolving narrative of India's infrastructure advancement, the Delhi-Jaipur Expressway emerges not merely as a road but as a transformative force reshaping connectivity, commerce, and the future of regional development. A strategic segment...
    BS

    By Bharat

    Thu Jun 19 2025

    3 min read
  • Expressways in India: Completed, Ongoing & Upcoming Projects
    Expressways in India: Completed, Ongoing & Upcoming ProjectsIndia is witnessing a rapid transformation in its road infrastructure with the development of high-speed expressways connecting key cities and industrial corridors. These access-controlled highways are designed to boost connectivity, reduce travel ti...
    PV

    By Pratham

    Tue Jun 17 2025

    4 min read
  • Varanasi–Ranchi–Kolkata Expressway: All Villages & Route Details Revealed
    Varanasi–Ranchi–Kolkata Expressway: All Villages & Route Details RevealedA Seamless Link from Varanasi to Kolkata via Ranchi Now Taking ShapeThe Varanasi–Ranchi–Kolkata Expressway — also known as the Varanasi–Kolkata Expressway — is a major greenfield project under the Government of India’s ambitious Bharatmala Pariyojna....
    PV

    By Pratham

    Mon Jun 16 2025

    5 min read
  • Delhi-Mumbai Expressway Delay: Completion Expected in 2027
    Delhi-Mumbai Expressway Delay: Completion Expected in 2027IntroductionThe Delhi-Mumbai Expressway, India’s longest expressway under development, will take two more years to complete. The original deadline, March 2024, shifted earlier to October 2025, but current progress suggests final completion may not ha...
    PV

    By Pratham

    Fri Jun 13 2025

    3 min read
  • 701 Km Samruddhi Expressway Nears Completion, Final Stretch Ready
    701 Km Samruddhi Expressway Nears Completion, Final Stretch ReadyIntroductionThe Samruddhi Expressway, now fully connected, links Mumbai to Nagpur through a 701-kilometre high-speed corridor. The last 76-km section, between Igatpuri and Amane, is now operational—marking the project's completion.Final Section: Buil...
    PV

    By Pratham

    Thu Jun 12 2025

    3 min read
  • Yamuna Expressway: Features, Tolls, and Top Travel Tips
    Yamuna Expressway: Features, Tolls, and Top Travel TipsThe Yamuna Expressway, also known as the Taj Expressway, is a 165.5-kilometre-long, six-lane (expandable to eight) access-controlled expressway connecting Pari Chowk in Greater Noida to Kuberpur near Agra. Since its inauguration on 9 August 2012, the...
    PV

    By Pratham

    Thu Jun 12 2025

    4 min read
Latest News
*Prices are indicative and subject to change.
91Infra

91Infra is a rapidly growing digital platform that provides the latest updates and detailed information about the infrastructure and construction equipment industry.

Our Partner Website

91trucks.com
91tractors.com
Get Connected