JCB 385LC QUARRY MASTER
  • +1 Images

JCB 385LC QUARRY MASTER

0(0 Reviews)

JCB 385LC QUARRY MASTER is available in the India market with an ex-showroom price of . JCB 385LC QUARRY MASTER comes with 285 HP,1.4 cu.m - 1.8 cu.m,1150 Nm ,590 Ltr.

Price coming soon*

View Price Breakup

EMI starts @

*****/month*

Ex-showroom price in

EMI starts @

*****/month*

JCB 385LC QUARRY MASTER Construction Equipments Specs & Features

  • 285 HP
    Power
  • 1.4 cu.m - 1.8 cu.m
    Bucket Capacity
  • 1150 Nm
    Maximum Torque
  • 590 Ltr
    Fuel Tank Capacity

JCB 385LC QUARRY MASTER Latest Update

Introducing the all-new JCB 385LC Quarry Master Excavator to make things easy in the hard world. It’s been tailored to your applications, your business, and your world. The mechanical fuel injection system allows the engine to tolerate lower fuel quality. Even the hydraulics are tailor-designed to maintain their level of productivity. Get ready to move more material for less cost. Manufactured at the world-class JCB Pune factory, this excavator has a robust structure and well-engineered components, making it a reliable partner helping you do more.

JCB 385LC QUARRY MASTER Construction Equipments Overview

JCB 385LC QUARRY MASTER Construction Equipments Engine

JCB 385LC QUARRY MASTER is powered by 285 HP , 1.4 cu.m - 1.8 cu.m , 1150 Nm and 590 Ltr

JCB 385LC QUARRY MASTER Latest Price in India 2025

JCB 385LC QUARRY MASTER is available in India starting from 0

JCB 385LC QUARRY MASTER Alternatives & Competitors

Main rival Construction Equipments of JCB 385LC QUARRY MASTER are JCB 3DX, ACE AX-124, ACE AX-124 NS, BOBCAT B900, BULL CH76 Challenger and CAT 424

Keep reading to explore more about JCB 385LC QUARRY MASTER's updated specs, latest prices, horsepower, genuine user reviews, exclusive images, best offers near you, Construction Equipments dealers.

JCB 385LC QUARRY MASTER Variant Price Range
Base

JCB 385LC QUARRY MASTER Price List Variants

JCB 385LC QUARRY MASTER Images

  • JCB 385LC QUARRY MASTER

JCB 385LC QUARRY MASTER Specifications

  • Engine
  • Hydraulic system
  • General
  • Dimensions
  • Swing Mechanism
  • Weights
  • Working Ranges & Forces
  • Service Refill Capacities
Engine
Net Power Iso 9249284 HP
Hydraulic system
Main Maximum Flow304
General
CategoryExcavator
Sub CategoryHeavy Duty
Power285 HP
Weight Ground Cleaner1160
Dimensions
Ground Clearance507
Track Gauge2600
Counterweight Clearance1160
Tail Swing Radius3570
Bucket Capacity1.4 cu.m - 1.8 cu.m
Swing Mechanism
Maximum Torque1150 Nm
Weights
Fuel Tank Capacity590Ltr
Engine Oil25
Hydraulic Including Tank430
Working Ranges & Forces
Maximum Digging Depth6800
Maximum Vertical Wall Digging Depth62.15
Lifting Capacity10150
Service Refill Capacities
Hydraulic430 Ltr

Compare JCB 385LC QUARRY MASTER with Competitors

JCB 385LC QUARRY MASTER User Reviews

JCB 385LC QUARRY MASTER User Review

Be The First to Rate

      Have a question in your mind about JCB 385LC QUARRY MASTER ?

      Get your answer from expert and users

        JCB 385LC QUARRY MASTER Brochure

        Download JCB 385LC QUARRY MASTER Brochure to check more details.

        Explore More Options

        Latest News

        • Telangana Seeks Fast Approval for RRR, Amaravati ExpresswayIn a decisive move underscoring Telangana's infrastructure ambitions, the state government has intensified its appeal to the Centre for expeditious clearance of two transformative road projects — the Regional Ring Road (RRR) and the Hyderabad-Amarava...
          BS

          By Bharat

          Wed Jun 25 2025

          5 min read
        • Mumbai-Goa Highway to Be Finished by June 2025The long-standing infrastructure endeavour known as the Mumbai-Goa Highway is poised for completion by June 2025, ushering in a new era of regional integration and economic acceleration along India’s western coastline. With several critical segments...
          BS

          By Bharat

          Tue Jun 24 2025

          3 min read
        • Delhi-Mumbai Expressway's 8-Lane Tunnel Nears CompletionThe Delhi-Mumbai Expressway is close to marking a major achievement with the upcoming completion of its 8-lane tunnel. Built near Sohna in Haryana, this tunnel is set to become the widest road tunnel in India, forming a vital segment of the Delhi Exp...
          BS

          By Bharat

          Mon Jun 23 2025

          3 min read
        • Gorakhpur Link Expressway Opens: Faster, Smoother Travel BeginsA Landmark Milestone in Eastern UP’s Road InfrastructureWith a formal inauguration on June 20, 2025, the long-anticipated Gorakhpur Link Expressway has finally opened to the public. This 91.35 km marvel of engineering is not just a road; it is a life...
          BS

          By Bharat

          Fri Jun 20 2025

          6 min read
        • Delhi-Jaipur Expressway: A New Era of ConnectivityIn the ever-evolving narrative of India's infrastructure advancement, the Delhi-Jaipur Expressway emerges not merely as a road but as a transformative force reshaping connectivity, commerce, and the future of regional development. A strategic segment...
          BS

          By Bharat

          Thu Jun 19 2025

          3 min read
        • Expressways in India: Completed, Ongoing & Upcoming ProjectsIndia is witnessing a rapid transformation in its road infrastructure with the development of high-speed expressways connecting key cities and industrial corridors. These access-controlled highways are designed to boost connectivity, reduce travel ti...
          PV

          By Pratham

          Tue Jun 17 2025

          4 min read
        • Varanasi–Ranchi–Kolkata Expressway: All Villages & Route Details RevealedA Seamless Link from Varanasi to Kolkata via Ranchi Now Taking ShapeThe Varanasi–Ranchi–Kolkata Expressway — also known as the Varanasi–Kolkata Expressway — is a major greenfield project under the Government of India’s ambitious Bharatmala Pariyojna....
          PV

          By Pratham

          Mon Jun 16 2025

          5 min read
        • Delhi-Mumbai Expressway Delay: Completion Expected in 2027IntroductionThe Delhi-Mumbai Expressway, India’s longest expressway under development, will take two more years to complete. The original deadline, March 2024, shifted earlier to October 2025, but current progress suggests final completion may not ha...
          PV

          By Pratham

          Fri Jun 13 2025

          3 min read
        • 701 Km Samruddhi Expressway Nears Completion, Final Stretch ReadyIntroductionThe Samruddhi Expressway, now fully connected, links Mumbai to Nagpur through a 701-kilometre high-speed corridor. The last 76-km section, between Igatpuri and Amane, is now operational—marking the project's completion.Final Section: Buil...
          PV

          By Pratham

          Thu Jun 12 2025

          3 min read
        • Yamuna Expressway: Features, Tolls, and Top Travel TipsThe Yamuna Expressway, also known as the Taj Expressway, is a 165.5-kilometre-long, six-lane (expandable to eight) access-controlled expressway connecting Pari Chowk in Greater Noida to Kuberpur near Agra. Since its inauguration on 9 August 2012, the...
          PV

          By Pratham

          Thu Jun 12 2025

          4 min read
        Latest News
        *Prices are indicative and subject to change.
        91Infra

        91Infra is a rapidly growing digital platform that provides the latest updates and detailed information about the infrastructure and construction equipment industry.

        Our Partner Website

        Get Connected