CASE 770NXe
  • +2 Images

CASE 770NXe

0(0 Reviews)

CASE 770NXe is available in the India market with an ex-showroom price of ₹28.00 Lakh. CASE 770NXe comes with 49.5 HP,1.1 cu.m,252.2 Nm,129 Ltr Ltr.

₹28.00 Lakh*

View Price Breakup

EMI starts @

₹52,311/Month*

Ex-showroom price in

CASE 770NXe

EMI starts @

₹52,311/Month*

  • 770NXe
  • Price
  • Variants
  • Images
  • Specs
  • Reviews
  • Q&A
  • Videos
  • EMI
  • Brochure

CASE 770NXe Construction Equipments Specs & Features

  • 49.5 HP
    Power
  • 1.1 cu.m
    Bucket Capacity
  • 252.2 Nm
    Maximum Torque
  • 129 Ltr Ltr
    Fuel Tank Capacity

CASE 770NXe Latest Update

The CASE 770NXe is a fuel-efficient backhoe loader designed for high productivity and low operating costs. It features a 49.5 HP engine and advanced electro-hydraulics, making it ideal for urban infrastructure projects and general construction tasks.​

Read More

CASE 770NXe Construction Equipments Overview

CASE 770NXe Construction Equipments Engine

CASE 770NXe is powered by 49.5 HP , 1.1 cu.m , 252.2 Nm and 129 Ltr Ltr

CASE 770NXe Latest Price in India 2025

CASE 770NXe is available in India starting from ₹28.00 Lakh

CASE 770NXe Alternatives & Competitors

Main rival Construction Equipments of CASE 770NXe are JCB 3DX, BOBCAT B900, JCB 3DX Xtra, Tata Hitachi Shinrai Pro, Schwing Stetter GTBZ18A1 Boomlift and CASE 770 EX

Keep reading to explore more about CASE 770NXe's updated specs, latest prices, horsepower, genuine user reviews, exclusive images, best offers near you, Construction Equipments dealers.

CASE 770NXe Variant Price Range
Base ₹28.00 Lakh

Read More

CASE 770NXe Price List Variants

CASE 770NXe Images

  • CASE 770NXe

    CASE 770NXe

  • CASE 770NXe

    CASE 770NXe

CASE 770NXe Specifications

  • Engine
  • Loader General Dimension
  • Backhoe Loader Dimension
  • Overall Dimension & Weight
  • Hydraulic system
  • Service Capacities
  • Axle
  • Steering
  • Brakes
  • Tyre
  • Electrical System
  • Power Train
  • General
  • Dimensions
  • Swing Mechanism
  • Weights
Engine
ModelS8000
CompliantBS-III
Air Intake TypeWater Cooled
Loader General Dimension
Dump Height2720
Load Over Height3300 MM
Hinge Pin Height3580
Hinge Pin Forward Reach240 MM
Reach At Ground1980 MM
Max Reach At Full Height Bucket Dumped1190
Below Ground Level Dig Depth110 MM
Rollback At Ground33 Deg.
Dump Angle45 Deg
Bucket Capacity Std1.1
Loader Arm Breakout Force5110/50.11 (kgf/kN)
Max Pay Load1925 kg
Maximum Lifting Capacity3425
Backhoe Loader Dimension
Dipper Configuration14 Feet
Max Dig Depth4400 mm
Reach Ground Level To Swing Center5630
Reach Ground Level To Rear Wheel Center6950
Reach At Full Height To Slew Center2150
Max Working Height5490
Max Load Over Height3640
Bucket Capacity Backhoe0.26
Bucket Rotation185 Degree
Bucket Breakout Force5000/49.03 (kgf/kN)
Dipper Tear Out Force2751/26.98 (kgf/kN)
Max Lift Capacity1417 Kg
Safe Working Load1300 kg
Overall Dimension & Weight
Max Operating Weight7610
Transport Length5880
Width Over Stabilizer2270 MM
Width Over Bucket2280 MM
Track Width Rear1700 MM
Track Width Front1880 MM
Minimum Ground Clearance380 MM
Height To Top Of Cabin2880
Overall Transport Height3850
Hydraulic system
Pump TypeAxial Piston with Electric Displacement Cntrol
Pump Flow119 lpm
Relief Pressure240 Bar
Service Capacities
Rear Axle17.1 Ltr.
Hydraulic Oil Replacement48/4000 hr.
Hydraulic Oil100
Transmission Oil Capacity18 Ltr.
Axle
Front Oscillation±21 degree(2WD)
Steering
Unit Displacement125 CC
Turning Circle Diameter Outside Bucket4.6
Turning Circle Diameter Outside Bucket Not Braked5.55
Brakes
ServiceHydraulic foot operated, 2 disc per side
ParkingMechanically actuated caliper type brake pack on rear axle input shaft
Tyre
Hd Rear Optional14x25- 12PR
Standard Front9x16 -16PR
Standard Rear16.9x28 -12PR
Electrical System
Battery12 volts, 110 Ah
Power Train
Transmission Make And ModelCARRARO 2WD TLB1
Powertrain Type4F-4R Shuttle Synchromesh Transmission
General
CategoryBackhoe Loader
Power49.5 HP
Forward5.0/7.9/16.9/32.4
Reverse5.9/9.4/19.8/NR
Dimensions
Bucket Capacity1.1 cu.m
Swing Mechanism
Maximum Torque252.2 Nm
Weights
Fuel Tank Capacity129 LtrLtr

Compare CASE 770NXe with Competitors

CASE 770NXe User Reviews

CASE 770NXe User Review

Be The First to Rate

      Have a question in your mind about CASE 770NXe ?

      Get your answer from expert and users

      QNA

        CASE 770NXe EMI Calculator

        EMI ₹52,311 per month

        Loan Amount

        Interest Amount

        0

        ₹28,00,000

        7%

        18%

        Time Period (in years)

        1 year

        7 year

        ₹25,20,000

        ₹6,18,664

        ₹31,38,664

        EMI starting at

        ₹52,311 /month*

        CASE 770NXe Brochure

        Download CASE 770NXe Brochure to check more details.

        Explore More Options

        • Dealers

          Connect with trusted dealers for the best offers

        • Comparison

          Compare vehicle side by side and choose the best

        Latest News

        • Telangana Seeks Fast Approval for RRR, Amaravati Expressway
          Telangana Seeks Fast Approval for RRR, Amaravati ExpresswayIn a decisive move underscoring Telangana's infrastructure ambitions, the state government has intensified its appeal to the Centre for expeditious clearance of two transformative road projects — the Regional Ring Road (RRR) and the Hyderabad-Amarava...
          BS

          By Bharat

          Wed Jun 25 2025

          5 min read
        • Mumbai-Goa Highway to Be Finished by June 2025
          Mumbai-Goa Highway to Be Finished by June 2025The long-standing infrastructure endeavour known as the Mumbai-Goa Highway is poised for completion by June 2025, ushering in a new era of regional integration and economic acceleration along India’s western coastline. With several critical segments...
          BS

          By Bharat

          Tue Jun 24 2025

          3 min read
        • Delhi-Mumbai Expressway's 8-Lane Tunnel Nears Completion
          Delhi-Mumbai Expressway's 8-Lane Tunnel Nears CompletionThe Delhi-Mumbai Expressway is close to marking a major achievement with the upcoming completion of its 8-lane tunnel. Built near Sohna in Haryana, this tunnel is set to become the widest road tunnel in India, forming a vital segment of the Delhi Exp...
          BS

          By Bharat

          Mon Jun 23 2025

          3 min read
        • Gorakhpur Link Expressway Opens: Faster, Smoother Travel Begins
          Gorakhpur Link Expressway Opens: Faster, Smoother Travel BeginsA Landmark Milestone in Eastern UP’s Road InfrastructureWith a formal inauguration on June 20, 2025, the long-anticipated Gorakhpur Link Expressway has finally opened to the public. This 91.35 km marvel of engineering is not just a road; it is a life...
          BS

          By Bharat

          Fri Jun 20 2025

          6 min read
        • Delhi-Jaipur Expressway: A New Era of Connectivity
          Delhi-Jaipur Expressway: A New Era of ConnectivityIn the ever-evolving narrative of India's infrastructure advancement, the Delhi-Jaipur Expressway emerges not merely as a road but as a transformative force reshaping connectivity, commerce, and the future of regional development. A strategic segment...
          BS

          By Bharat

          Thu Jun 19 2025

          3 min read
        • Expressways in India: Completed, Ongoing & Upcoming Projects
          Expressways in India: Completed, Ongoing & Upcoming ProjectsIndia is witnessing a rapid transformation in its road infrastructure with the development of high-speed expressways connecting key cities and industrial corridors. These access-controlled highways are designed to boost connectivity, reduce travel ti...
          PV

          By Pratham

          Tue Jun 17 2025

          4 min read
        • Varanasi–Ranchi–Kolkata Expressway: All Villages & Route Details Revealed
          Varanasi–Ranchi–Kolkata Expressway: All Villages & Route Details RevealedA Seamless Link from Varanasi to Kolkata via Ranchi Now Taking ShapeThe Varanasi–Ranchi–Kolkata Expressway — also known as the Varanasi–Kolkata Expressway — is a major greenfield project under the Government of India’s ambitious Bharatmala Pariyojna....
          PV

          By Pratham

          Mon Jun 16 2025

          5 min read
        • Delhi-Mumbai Expressway Delay: Completion Expected in 2027
          Delhi-Mumbai Expressway Delay: Completion Expected in 2027IntroductionThe Delhi-Mumbai Expressway, India’s longest expressway under development, will take two more years to complete. The original deadline, March 2024, shifted earlier to October 2025, but current progress suggests final completion may not ha...
          PV

          By Pratham

          Fri Jun 13 2025

          3 min read
        • 701 Km Samruddhi Expressway Nears Completion, Final Stretch Ready
          701 Km Samruddhi Expressway Nears Completion, Final Stretch ReadyIntroductionThe Samruddhi Expressway, now fully connected, links Mumbai to Nagpur through a 701-kilometre high-speed corridor. The last 76-km section, between Igatpuri and Amane, is now operational—marking the project's completion.Final Section: Buil...
          PV

          By Pratham

          Thu Jun 12 2025

          3 min read
        • Yamuna Expressway: Features, Tolls, and Top Travel Tips
          Yamuna Expressway: Features, Tolls, and Top Travel TipsThe Yamuna Expressway, also known as the Taj Expressway, is a 165.5-kilometre-long, six-lane (expandable to eight) access-controlled expressway connecting Pari Chowk in Greater Noida to Kuberpur near Agra. Since its inauguration on 9 August 2012, the...
          PV

          By Pratham

          Thu Jun 12 2025

          4 min read
        Latest News
        *Prices are indicative and subject to change.
        91Infra

        91Infra is a rapidly growing digital platform that provides the latest updates and detailed information about the infrastructure and construction equipment industry.

        Our Partner Website

        91trucks.com
        91tractors.com
        Get Connected