CASE 770
  • +1 Images

CASE 770

0(0 Reviews)

CASE 770 is available in the India market with an ex-showroom price of ₹32.00 Lakh. CASE 770 comes with 76 HP,1 cu.m,300 Nm,122 Ltr.

₹32.00 Lakh*

View Price Breakup

EMI starts @

₹59,784/Month*

Ex-showroom price in

CASE 770

EMI starts @

₹59,784/Month*

  • 770
  • Price
  • Variants
  • Images
  • Specs
  • Reviews
  • Q&A
  • Videos
  • EMI
  • Brochure

CASE 770 - Pick Up Truck Price & Specs

​The CASE 770 is a versatile backhoe loader widely used in construction and infrastructure projects across India. Known for its robust performance and cost-effectiveness, it remains a popular choice among contractors.

Read More

CASE 770 Construction Equipments Features

  • 76 HP
    Power
  • 1 cu.m
    Bucket Capacity
  • 300 Nm
    Maximum Torque
  • 122 Ltr
    Fuel Tank Capacity

CASE 770 Latest Update

​The CASE 770 is a versatile backhoe loader widely used in construction and infrastructure projects across India. Known for its robust performance and cost-effectiveness, it remains a popular choice among contractors.

Read More

CASE 770 Construction Equipments Overview

CASE 770 Construction Equipments Engine

CASE 770 is powered by 76 HP , 1 cu.m , 300 Nm and 122 Ltr

CASE 770 Latest Price in India 2025

CASE 770 is available in India starting from ₹32.00 Lakh

CASE 770 Alternatives & Competitors

Main rival Construction Equipments of CASE 770 are JCB 3DX, ACE AX-124, ACE AX-124 NS, BULL CH76 Challenger, CAT 424 B and JCB 3DX Super

Keep reading to explore more about CASE 770's updated specs, latest prices, horsepower, genuine user reviews, exclusive images, best offers near you, Construction Equipments dealers.

CASE 770 Variant Price Range
Base ₹32.00 Lakh

Read More

CASE 770 Price List Variants

CASE 770 Images

  • CASE 770

    CASE 770

CASE 770 Specifications

  • Engine
  • Loader General Dimension
  • Backhoe Loader Dimension
  • Overall Dimension & Weight
  • Hydraulic system
  • Service Capacities
  • Brakes
  • Tyre
  • Electrical System
  • General
  • Dimensions
  • Swing Mechanism
  • Weights
Engine
Model4R1040TC BS-III
CompliantBS-III
Air Intake TypeTurbo charged Water Cooled
Loader General Dimension
Dump Height3550
Max Reach At Full Height Bucket Dumped2357
Dump Angle43
Bucket Capacity Std1 Cum
Max Pay Load1760
Maximum Lifting Capacity3425
Backhoe Loader Dimension
Max Dig Depth4335
Bucket Capacity Backhoe0.2
Bucket Rotation204 Degree
Bucket Breakout Force5093 Kgf
Max Lift Capacity1315
Overall Dimension & Weight
Max Operating Weight7500
Transport Length5887
Overall Transport Height3887
Hydraulic system
Pump TypeGear pump
Pump Flow121 lpm
Service Capacities
Rear Axle22 Ltr.
Hydraulic Oil142
Transmission Oil Capacity16 Ltr.
Brakes
ServiceOil immersed wet disc brakes on rear wheels hydraulically actuated
Tyre
Hd Rear Optional14x25 - 20 PR
Standard Front16.9X28
Standard Rear16.9X28
Electrical System
Battery12 V,130 Ah
General
CategoryBackhoe Loader
Power76 HP
Forward4.8/7.8/16.6/29.7
Reverse5.8/9.3/Not Recommended
Dimensions
Bucket Capacity1 cu.m
Swing Mechanism
Maximum Torque300 Nm
Weights
Fuel Tank Capacity122Ltr

Compare CASE 770 with Competitors

CASE 770 User Reviews

CASE 770 User Review

Be The First to Rate

      Have a question in your mind about CASE 770 ?

      Get your answer from expert and users

      QNA

        CASE 770 EMI Calculator

        EMI ₹59,784 per month

        Loan Amount

        Interest Amount

        0

        ₹32,00,000

        7%

        18%

        Time Period (in years)

        1 year

        7 year

        ₹28,80,000

        ₹7,07,044

        ₹35,87,044

        EMI starting at

        ₹59,784 /month*

        CASE 770 Brochure

        Download CASE 770 Brochure to check more details.

        Explore More Options

        • Dealers

          Connect with trusted dealers for the best offers

        • Comparison

          Compare vehicle side by side and choose the best

        Latest News

        • JCB 3DX on road price in India in 2025: Specs and Features
          JCB 3DX on road price in India in 2025: Specs and FeaturesIn India, the JCB 3DX is a reliable backhoe loader. It is known for being powerful and reliable, and it can undertake challenging duties on construction and infrastructure projects. The JCB pricing in 2025 shows how well it works and how new its feat...
          BS

          By Bharat

          Mon Jul 28 2025

          3 min read
        • ACE Construction Targets ₹6,300 Cr Revenue by FY30 via Diversification
          ACE Construction Targets ₹6,300 Cr Revenue by FY30 via DiversificationAction Construction Equipment Ltd. (ACE), a leading equipment manufacturer based in Faridabad, plans to double its revenue to ₹6,000–6,300 crore by FY2030. This growth will come from expansion across infrastructure (infra), agriculture, exports, and...
          PV

          By Pratham

          Tue Jul 22 2025

          5 min read
        • CASE Launches Training Program for Unemployed Youth
          CASE Launches Training Program for Unemployed YouthCASE Construction Equipment, a leading name in India’s infrastructure sector, has launched Project Shilpi, a training initiative for unemployed youth. The program focuses on building technical skills for careers in construction equipment servicing.A...
          BS

          By Bharat

          Thu Jul 17 2025

          3 min read
        • Telangana Seeks Fast Approval for RRR, Amaravati Expressway
          Telangana Seeks Fast Approval for RRR, Amaravati ExpresswayIn a decisive move underscoring Telangana's infrastructure ambitions, the state government has intensified its appeal to the Centre for expeditious clearance of two transformative road projects — the Regional Ring Road (RRR) and the Hyderabad-Amarava...
          BS

          By Bharat

          Wed Jun 25 2025

          5 min read
        • Mumbai-Goa Highway to Be Finished by June 2025
          Mumbai-Goa Highway to Be Finished by June 2025The long-standing infrastructure endeavour known as the Mumbai-Goa Highway is poised for completion by June 2025, ushering in a new era of regional integration and economic acceleration along India’s western coastline. With several critical segments...
          BS

          By Bharat

          Tue Jun 24 2025

          3 min read
        • Delhi-Mumbai Expressway's 8-Lane Tunnel Nears Completion
          Delhi-Mumbai Expressway's 8-Lane Tunnel Nears CompletionThe Delhi-Mumbai Expressway is close to marking a major achievement with the upcoming completion of its 8-lane tunnel. Built near Sohna in Haryana, this tunnel is set to become the widest road tunnel in India, forming a vital segment of the Delhi Exp...
          BS

          By Bharat

          Mon Jun 23 2025

          3 min read
        • Gorakhpur Link Expressway Opens: Faster, Smoother Travel Begins
          Gorakhpur Link Expressway Opens: Faster, Smoother Travel BeginsA Landmark Milestone in Eastern UP’s Road InfrastructureWith a formal inauguration on June 20, 2025, the long-anticipated Gorakhpur Link Expressway has finally opened to the public. This 91.35 km marvel of engineering is not just a road; it is a life...
          BS

          By Bharat

          Fri Jun 20 2025

          6 min read
        • Delhi-Jaipur Expressway: A New Era of Connectivity
          Delhi-Jaipur Expressway: A New Era of ConnectivityIn the ever-evolving narrative of India's infrastructure advancement, the Delhi-Jaipur Expressway emerges not merely as a road but as a transformative force reshaping connectivity, commerce, and the future of regional development. A strategic segment...
          BS

          By Bharat

          Thu Jun 19 2025

          3 min read
        • Expressways in India: Completed, Ongoing & Upcoming Projects
          Expressways in India: Completed, Ongoing & Upcoming ProjectsIndia is witnessing a rapid transformation in its road infrastructure with the development of high-speed expressways connecting key cities and industrial corridors. These access-controlled highways are designed to boost connectivity, reduce travel ti...
          PV

          By Pratham

          Tue Jun 17 2025

          4 min read
        • Varanasi–Ranchi–Kolkata Expressway: All Villages & Route Details Revealed
          Varanasi–Ranchi–Kolkata Expressway: All Villages & Route Details RevealedA Seamless Link from Varanasi to Kolkata via Ranchi Now Taking ShapeThe Varanasi–Ranchi–Kolkata Expressway — also known as the Varanasi–Kolkata Expressway — is a major greenfield project under the Government of India’s ambitious Bharatmala Pariyojna....
          PV

          By Pratham

          Mon Jun 16 2025

          5 min read
        Latest News
        *Prices are indicative and subject to change.
        91Infra

        91Infra is a rapidly growing digital platform that provides the latest updates and detailed information about the infrastructure and construction equipment industry.

        Our Partner Website

        91trucks.com
        91tractors.com

        Get Connected