Tata Hitachi ZW370-5A
  • +1 Images

Tata Hitachi ZW370-5A

0(0 Reviews)

Tata Hitachi ZW370-5A is available in the India market with an ex-showroom price of . Tata Hitachi ZW370-5A comes with 402 HP,4.8.

Price coming soon*

View Price Breakup

EMI starts @

*****/month*

Ex-showroom price in

Tata Hitachi ZW370-5A

EMI starts @

*****/month*

  • ZW370-5A
  • Price
  • Variants
  • Images
  • Specs
  • Reviews
  • Q&A
  • Videos
  • EMI
  • Brochure

Tata Hitachi ZW370-5A Construction Equipments Specs & Features

  • 402 HP
    Max Power
  • 4.8
    Bucket Capacity

Tata Hitachi ZW370-5A Construction Equipments Overview

Tata Hitachi ZW370-5A Construction Equipments Engine

Tata Hitachi ZW370-5A is powered by 402 HP and 4.8

Tata Hitachi ZW370-5A Latest Price in India 2025

Tata Hitachi ZW370-5A is available in India starting from 0

Tata Hitachi ZW370-5A Alternatives & Competitors

Main rival Construction Equipments of Tata Hitachi ZW370-5A are JCB 4DX, ACE AX-124 4WD, ACE AX-124 NS, BOBCAT B900, BULL CH76 Challenger and BULL HD 100

Keep reading to explore more about Tata Hitachi ZW370-5A's updated specs, latest prices, horsepower, genuine user reviews, exclusive images, best offers near you, Construction Equipments dealers.

Tata Hitachi ZW370-5A Variant Price Range
Base

Read More

Tata Hitachi ZW370-5A Price List Variants

Tata Hitachi ZW370-5A Images

  • Tata Hitachi ZW370-5A

    Tata Hitachi ZW370-5A

Tata Hitachi ZW370-5A Specifications

  • Engine
  • Hydraulic system
  • General
  • Dimensions
  • Service Refill Capacities
Engine
ModelISUZU “6WG1”
Bore147 mm
Stroke154 mm
Max Power402 HP
Max Torque N M1932
Displacementl15.68
Hydraulic system
Implement Maximum Operating Pressure22500
Implement Maximum Flow90 L/min
General
CategoryWheeled Loader
Sub Categorylarge
Operating32570
Tipping Load Full Turn20420
Dimensions
Ground Clearance440
B Pin Height4655
Bucket Capacity4.8
Wheelbase3600mm
Service Refill Capacities
Fuel Tank438L
Hydraulic Tank178

Compare Tata Hitachi ZW370-5A with Competitors

Tata Hitachi ZW370-5A User Reviews

Tata Hitachi ZW370-5A User Review

Be The First to Rate

      Have a question in your mind about Tata Hitachi ZW370-5A ?

      Get your answer from expert and users

      QNA

        Tata Hitachi ZW370-5A Brochure

        Download Tata Hitachi ZW370-5A Brochure to check more details.

        Explore More Options

        • Dealers

          Connect with trusted dealers for the best offers

        • Comparison

          Compare vehicle side by side and choose the best

        Latest News

        • Telangana Seeks Fast Approval for RRR, Amaravati Expressway
          Telangana Seeks Fast Approval for RRR, Amaravati ExpresswayIn a decisive move underscoring Telangana's infrastructure ambitions, the state government has intensified its appeal to the Centre for expeditious clearance of two transformative road projects — the Regional Ring Road (RRR) and the Hyderabad-Amarava...
          BS

          By Bharat

          Wed Jun 25 2025

          5 min read
        • Mumbai-Goa Highway to Be Finished by June 2025
          Mumbai-Goa Highway to Be Finished by June 2025The long-standing infrastructure endeavour known as the Mumbai-Goa Highway is poised for completion by June 2025, ushering in a new era of regional integration and economic acceleration along India’s western coastline. With several critical segments...
          BS

          By Bharat

          Tue Jun 24 2025

          3 min read
        • Delhi-Mumbai Expressway's 8-Lane Tunnel Nears Completion
          Delhi-Mumbai Expressway's 8-Lane Tunnel Nears CompletionThe Delhi-Mumbai Expressway is close to marking a major achievement with the upcoming completion of its 8-lane tunnel. Built near Sohna in Haryana, this tunnel is set to become the widest road tunnel in India, forming a vital segment of the Delhi Exp...
          BS

          By Bharat

          Mon Jun 23 2025

          3 min read
        • Gorakhpur Link Expressway Opens: Faster, Smoother Travel Begins
          Gorakhpur Link Expressway Opens: Faster, Smoother Travel BeginsA Landmark Milestone in Eastern UP’s Road InfrastructureWith a formal inauguration on June 20, 2025, the long-anticipated Gorakhpur Link Expressway has finally opened to the public. This 91.35 km marvel of engineering is not just a road; it is a life...
          BS

          By Bharat

          Fri Jun 20 2025

          6 min read
        • Delhi-Jaipur Expressway: A New Era of Connectivity
          Delhi-Jaipur Expressway: A New Era of ConnectivityIn the ever-evolving narrative of India's infrastructure advancement, the Delhi-Jaipur Expressway emerges not merely as a road but as a transformative force reshaping connectivity, commerce, and the future of regional development. A strategic segment...
          BS

          By Bharat

          Thu Jun 19 2025

          3 min read
        • Expressways in India: Completed, Ongoing & Upcoming Projects
          Expressways in India: Completed, Ongoing & Upcoming ProjectsIndia is witnessing a rapid transformation in its road infrastructure with the development of high-speed expressways connecting key cities and industrial corridors. These access-controlled highways are designed to boost connectivity, reduce travel ti...
          PV

          By Pratham

          Tue Jun 17 2025

          4 min read
        • Varanasi–Ranchi–Kolkata Expressway: All Villages & Route Details Revealed
          Varanasi–Ranchi–Kolkata Expressway: All Villages & Route Details RevealedA Seamless Link from Varanasi to Kolkata via Ranchi Now Taking ShapeThe Varanasi–Ranchi–Kolkata Expressway — also known as the Varanasi–Kolkata Expressway — is a major greenfield project under the Government of India’s ambitious Bharatmala Pariyojna....
          PV

          By Pratham

          Mon Jun 16 2025

          5 min read
        • Delhi-Mumbai Expressway Delay: Completion Expected in 2027
          Delhi-Mumbai Expressway Delay: Completion Expected in 2027IntroductionThe Delhi-Mumbai Expressway, India’s longest expressway under development, will take two more years to complete. The original deadline, March 2024, shifted earlier to October 2025, but current progress suggests final completion may not ha...
          PV

          By Pratham

          Fri Jun 13 2025

          3 min read
        • 701 Km Samruddhi Expressway Nears Completion, Final Stretch Ready
          701 Km Samruddhi Expressway Nears Completion, Final Stretch ReadyIntroductionThe Samruddhi Expressway, now fully connected, links Mumbai to Nagpur through a 701-kilometre high-speed corridor. The last 76-km section, between Igatpuri and Amane, is now operational—marking the project's completion.Final Section: Buil...
          PV

          By Pratham

          Thu Jun 12 2025

          3 min read
        • Yamuna Expressway: Features, Tolls, and Top Travel Tips
          Yamuna Expressway: Features, Tolls, and Top Travel TipsThe Yamuna Expressway, also known as the Taj Expressway, is a 165.5-kilometre-long, six-lane (expandable to eight) access-controlled expressway connecting Pari Chowk in Greater Noida to Kuberpur near Agra. Since its inauguration on 9 August 2012, the...
          PV

          By Pratham

          Thu Jun 12 2025

          4 min read
        Latest News
        *Prices are indicative and subject to change.
        91Infra

        91Infra is a rapidly growing digital platform that provides the latest updates and detailed information about the infrastructure and construction equipment industry.

        Our Partner Website

        91trucks.com
        91tractors.com
        Get Connected