Tata Hitachi ZAXIS 470H
  • +1 Images

Tata Hitachi ZAXIS 470H

0(0 Reviews)

Tata Hitachi ZAXIS 470H is available in the India market with an ex-showroom price of . Tata Hitachi ZAXIS 470H comes with 15.681 L,315 Hp,705 Ltr.

Price coming soon*

View Price Breakup

EMI starts @

*****/month*

Ex-showroom price in

Tata Hitachi ZAXIS 470H

EMI starts @

*****/month*

  • ZAXIS 470H
  • Price
  • Variants
  • Images
  • Specs
  • Reviews
  • Q&A
  • Videos
  • EMI
  • Brochure

Tata Hitachi ZAXIS 470H Construction Equipments Specs & Features

  • 15.681 L
    Displacement
  • 315 Hp
    Power
  • 705 Ltr
    Fuel Tank Capacity

Tata Hitachi ZAXIS 470H Construction Equipments Overview

Tata Hitachi ZAXIS 470H Construction Equipments Engine

Tata Hitachi ZAXIS 470H is powered by 15.681 L , 315 Hp and 705 Ltr

Tata Hitachi ZAXIS 470H Latest Price in India 2025

Tata Hitachi ZAXIS 470H is available in India starting from 0

Tata Hitachi ZAXIS 470H Alternatives & Competitors

Main rival Construction Equipments of Tata Hitachi ZAXIS 470H are ACE AX-130, JCB 3DX, JCB 4DX, ACE AX-124, BOBCAT B900 and BULL HD 100

Keep reading to explore more about Tata Hitachi ZAXIS 470H's updated specs, latest prices, horsepower, genuine user reviews, exclusive images, best offers near you, Construction Equipments dealers.

Tata Hitachi ZAXIS 470H Variant Price Range
Base

Read More

Tata Hitachi ZAXIS 470H Price List Variants

Tata Hitachi ZAXIS 470H Images

  • Tata Hitachi ZAXIS 470H

    Tata Hitachi ZAXIS 470H

Tata Hitachi ZAXIS 470H Specifications

  • Engine
  • Hydraulic system
  • General
  • Dimensions
  • Weights
  • Working Ranges & Forces
  • Service Refill Capacities
Engine
Modelisuzu AA-6WG1TQA
Displacement15.681 L
Power315Hp
Net Power Iso 9249315 hp
Bore147
Stroke154
Hydraulic system
Main Maximum Flow2
General
CategoryExcavator
Sub CategoryMining
Dimensions
Shipping Height Top Of Cab3170
Ground Clearance495
Track Gauge2740
Weights
Operating Weight47100
Fuel Tank Capacity705Ltr
Engine Oil55
Hydraulic Tank310
Hydraulic Including Tank510
Cooling61
Working Ranges & Forces
Maximum Digging Depth11100
Bucket Capacity3.1
Maximum Cutting Height10070
Service Refill Capacities
Hydraulic510 L

Compare Tata Hitachi ZAXIS 470H with Competitors

Tata Hitachi ZAXIS 470H User Reviews

Tata Hitachi ZAXIS 470H User Review

Be The First to Rate

      Have a question in your mind about Tata Hitachi ZAXIS 470H ?

      Get your answer from expert and users

      QNA

        Tata Hitachi ZAXIS 470H Brochure

        Download Tata Hitachi ZAXIS 470H Brochure to check more details.

        Explore More Options

        • Dealers

          Connect with trusted dealers for the best offers

        • Comparison

          Compare vehicle side by side and choose the best

        Latest News

        • Telangana Seeks Fast Approval for RRR, Amaravati Expressway
          Telangana Seeks Fast Approval for RRR, Amaravati ExpresswayIn a decisive move underscoring Telangana's infrastructure ambitions, the state government has intensified its appeal to the Centre for expeditious clearance of two transformative road projects — the Regional Ring Road (RRR) and the Hyderabad-Amarava...
          BS

          By Bharat

          Wed Jun 25 2025

          5 min read
        • Mumbai-Goa Highway to Be Finished by June 2025
          Mumbai-Goa Highway to Be Finished by June 2025The long-standing infrastructure endeavour known as the Mumbai-Goa Highway is poised for completion by June 2025, ushering in a new era of regional integration and economic acceleration along India’s western coastline. With several critical segments...
          BS

          By Bharat

          Tue Jun 24 2025

          3 min read
        • Delhi-Mumbai Expressway's 8-Lane Tunnel Nears Completion
          Delhi-Mumbai Expressway's 8-Lane Tunnel Nears CompletionThe Delhi-Mumbai Expressway is close to marking a major achievement with the upcoming completion of its 8-lane tunnel. Built near Sohna in Haryana, this tunnel is set to become the widest road tunnel in India, forming a vital segment of the Delhi Exp...
          BS

          By Bharat

          Mon Jun 23 2025

          3 min read
        • Gorakhpur Link Expressway Opens: Faster, Smoother Travel Begins
          Gorakhpur Link Expressway Opens: Faster, Smoother Travel BeginsA Landmark Milestone in Eastern UP’s Road InfrastructureWith a formal inauguration on June 20, 2025, the long-anticipated Gorakhpur Link Expressway has finally opened to the public. This 91.35 km marvel of engineering is not just a road; it is a life...
          BS

          By Bharat

          Fri Jun 20 2025

          6 min read
        • Delhi-Jaipur Expressway: A New Era of Connectivity
          Delhi-Jaipur Expressway: A New Era of ConnectivityIn the ever-evolving narrative of India's infrastructure advancement, the Delhi-Jaipur Expressway emerges not merely as a road but as a transformative force reshaping connectivity, commerce, and the future of regional development. A strategic segment...
          BS

          By Bharat

          Thu Jun 19 2025

          3 min read
        • Expressways in India: Completed, Ongoing & Upcoming Projects
          Expressways in India: Completed, Ongoing & Upcoming ProjectsIndia is witnessing a rapid transformation in its road infrastructure with the development of high-speed expressways connecting key cities and industrial corridors. These access-controlled highways are designed to boost connectivity, reduce travel ti...
          PV

          By Pratham

          Tue Jun 17 2025

          4 min read
        • Varanasi–Ranchi–Kolkata Expressway: All Villages & Route Details Revealed
          Varanasi–Ranchi–Kolkata Expressway: All Villages & Route Details RevealedA Seamless Link from Varanasi to Kolkata via Ranchi Now Taking ShapeThe Varanasi–Ranchi–Kolkata Expressway — also known as the Varanasi–Kolkata Expressway — is a major greenfield project under the Government of India’s ambitious Bharatmala Pariyojna....
          PV

          By Pratham

          Mon Jun 16 2025

          5 min read
        • Delhi-Mumbai Expressway Delay: Completion Expected in 2027
          Delhi-Mumbai Expressway Delay: Completion Expected in 2027IntroductionThe Delhi-Mumbai Expressway, India’s longest expressway under development, will take two more years to complete. The original deadline, March 2024, shifted earlier to October 2025, but current progress suggests final completion may not ha...
          PV

          By Pratham

          Fri Jun 13 2025

          3 min read
        • 701 Km Samruddhi Expressway Nears Completion, Final Stretch Ready
          701 Km Samruddhi Expressway Nears Completion, Final Stretch ReadyIntroductionThe Samruddhi Expressway, now fully connected, links Mumbai to Nagpur through a 701-kilometre high-speed corridor. The last 76-km section, between Igatpuri and Amane, is now operational—marking the project's completion.Final Section: Buil...
          PV

          By Pratham

          Thu Jun 12 2025

          3 min read
        • Yamuna Expressway: Features, Tolls, and Top Travel Tips
          Yamuna Expressway: Features, Tolls, and Top Travel TipsThe Yamuna Expressway, also known as the Taj Expressway, is a 165.5-kilometre-long, six-lane (expandable to eight) access-controlled expressway connecting Pari Chowk in Greater Noida to Kuberpur near Agra. Since its inauguration on 9 August 2012, the...
          PV

          By Pratham

          Thu Jun 12 2025

          4 min read
        Latest News
        *Prices are indicative and subject to change.
        91Infra

        91Infra is a rapidly growing digital platform that provides the latest updates and detailed information about the infrastructure and construction equipment industry.

        Our Partner Website

        91trucks.com
        91tractors.com
        Get Connected