MAHINDRA EarthMaster SXL
  • +5 Images

MAHINDRA EarthMaster SXL

0(0 Reviews)

MAHINDRA EarthMaster SXL is available in the India market with an ex-showroom price of ₹26.00 Lakh. MAHINDRA EarthMaster SXL comes with 3532 CC,306 NM,0.27.

₹26.00 Lakh*

View Price Breakup

EMI starts @

₹48,575/Month*

Ex-showroom price in

MAHINDRA EarthMaster SXL

EMI starts @

₹48,575/Month*

  • EarthMaster SXL
  • Price
  • Variants
  • Images
  • Specs
  • Reviews
  • Q&A
  • Videos
  • EMI
  • Brochure

MAHINDRA EarthMaster SXL Construction Equipments Specs & Features

  • 3532 CC
    Displacement
  • 306 NM
    Maximum Torque
  • 0.27
    Bucket Capacity

MAHINDRA EarthMaster SXL Construction Equipments Overview

MAHINDRA EarthMaster SXL Construction Equipments Engine

MAHINDRA EarthMaster SXL is powered by 3532 CC , 306 NM and 0.27

MAHINDRA EarthMaster SXL Latest Price in India 2025

MAHINDRA EarthMaster SXL is available in India starting from ₹26.00 Lakh

MAHINDRA EarthMaster SXL Alternatives & Competitors

Main rival Construction Equipments of MAHINDRA EarthMaster SXL are ACE AX-130, ACE AX-124, ACE AX-124 4WD, ACE AX-124 NS, BOBCAT B900 and BULL CH76 Challenger

Keep reading to explore more about MAHINDRA EarthMaster SXL's updated specs, latest prices, horsepower, genuine user reviews, exclusive images, best offers near you, Construction Equipments dealers.

MAHINDRA EarthMaster SXL Variant Price Range
Base ₹26.00 Lakh

Read More

MAHINDRA EarthMaster SXL Price List Variants

MAHINDRA EarthMaster SXL Images

  • MAHINDRA EarthMaster SXL

    MAHINDRA EarthMaster SXL

  • MAHINDRA EarthMaster SXL

    MAHINDRA EarthMaster SXL

  • MAHINDRA EarthMaster SXL

    MAHINDRA EarthMaster SXL

  • MAHINDRA EarthMaster SXL

    MAHINDRA EarthMaster SXL

  • MAHINDRA EarthMaster SXL

    MAHINDRA EarthMaster SXL

MAHINDRA EarthMaster SXL Specifications

  • Engine
  • Loader General Dimension
  • Backhoe Loader Dimension
  • Overall Dimension & Weight
  • Hydraulic system
  • Service Capacities
  • Axle
  • Steering
  • Brakes
  • Tyre
  • Electrical System
  • Power Train
  • General
Engine
Model4805-IA-CEV
CompliantBSIII
Displacement3532 CC
Gross Power79.89 Hp
Maximum Torque306 NM
Loader General Dimension
Dump Height2900
Load Over Height3452
Hinge Pin Height3657
Hinge Pin Forward Reach352
Reach At Ground1639
Max Reach At Full Height Bucket Dumped1231
Below Ground Level Dig Depth131
Dump Angle44 Deg.
Bucket Capacity Std1.1
Bucket Breakout Force6075 Kg
Loader Arm Breakout Force4990 kg
Max Pay Load1800
Backhoe Loader Dimension
Bucket Capacity0.27
Max Lift Capacity2493
Overall Dimension & Weight
Max Operating Weight7771
Transport Length4420
Width Over Bucket2404 mm
Track Width Rear1720 MM
Track Width Front1914 mm
Wheelbase2175 mm
Minimum Ground Clearance321
Height To Top Of Cabin2923
Overall Transport Height2482
Hydraulic system
Pump TypeFixed Displacement Gear Pump
Pump Flow115 Ltr
TypeOpen Centre
Service Capacities
Engine Oil13.7
Rear Axle17.1 Ltr
Fuel Tank120 Litres
Coolant17 Ltr
Hydraulic Oil100
Transmission Oil Capacity19.2 Ltr
Axle
RearRigidly mounted drive axle, with outbound planetary final drives, driven by short drive shaft
FrontCentrally pivoted, non-driven unbalanced type axle, with total oscillation of 16°, with remote greasing facility for the main pin.
Steering
TypeHydrostatic Power Steering,
Pressure145 bar
Brakes
ServiceHydraulically actuated, self adjusting, maintenance free, oil immersed multi-disc, on the rear axle, operated by independent foot pedals, joined together for normal operation.
ParkingHand operated, inbuilt in the rear axle, low maintenance
Tyre
Standard Front9 × 16-16PR
Standard Rear16.9 x 28-12 PR/ 14 x 25 -12 PR/20 PR
Electrical System
Battery12 V, 100 Ah
Power Train
Transmission Make And Model4 Speed (4 Forward and 4 Reverse)
General
CategoryBackhoe Loader

Compare MAHINDRA EarthMaster SXL with Competitors

MAHINDRA EarthMaster SXL User Reviews

MAHINDRA EarthMaster SXL User Review

Be The First to Rate

      Have a question in your mind about MAHINDRA EarthMaster SXL ?

      Get your answer from expert and users

      QNA

        MAHINDRA EarthMaster SXL EMI Calculator

        EMI ₹48,575 per month

        Loan Amount

        Interest Amount

        0

        ₹26,00,000

        7%

        18%

        Time Period (in years)

        1 year

        7 year

        ₹23,40,000

        ₹5,74,473

        ₹29,14,473

        EMI starting at

        ₹48,575 /month*

        MAHINDRA EarthMaster SXL Brochure

        Download MAHINDRA EarthMaster SXL Brochure to check more details.

        Explore More Options

        • Dealers

          Connect with trusted dealers for the best offers

        • Comparison

          Compare vehicle side by side and choose the best

        Latest News

        • Telangana Seeks Fast Approval for RRR, Amaravati Expressway
          Telangana Seeks Fast Approval for RRR, Amaravati ExpresswayIn a decisive move underscoring Telangana's infrastructure ambitions, the state government has intensified its appeal to the Centre for expeditious clearance of two transformative road projects — the Regional Ring Road (RRR) and the Hyderabad-Amarava...
          BS

          By Bharat

          Wed Jun 25 2025

          5 min read
        • Mumbai-Goa Highway to Be Finished by June 2025
          Mumbai-Goa Highway to Be Finished by June 2025The long-standing infrastructure endeavour known as the Mumbai-Goa Highway is poised for completion by June 2025, ushering in a new era of regional integration and economic acceleration along India’s western coastline. With several critical segments...
          BS

          By Bharat

          Tue Jun 24 2025

          3 min read
        • Delhi-Mumbai Expressway's 8-Lane Tunnel Nears Completion
          Delhi-Mumbai Expressway's 8-Lane Tunnel Nears CompletionThe Delhi-Mumbai Expressway is close to marking a major achievement with the upcoming completion of its 8-lane tunnel. Built near Sohna in Haryana, this tunnel is set to become the widest road tunnel in India, forming a vital segment of the Delhi Exp...
          BS

          By Bharat

          Mon Jun 23 2025

          3 min read
        • Gorakhpur Link Expressway Opens: Faster, Smoother Travel Begins
          Gorakhpur Link Expressway Opens: Faster, Smoother Travel BeginsA Landmark Milestone in Eastern UP’s Road InfrastructureWith a formal inauguration on June 20, 2025, the long-anticipated Gorakhpur Link Expressway has finally opened to the public. This 91.35 km marvel of engineering is not just a road; it is a life...
          BS

          By Bharat

          Fri Jun 20 2025

          6 min read
        • Delhi-Jaipur Expressway: A New Era of Connectivity
          Delhi-Jaipur Expressway: A New Era of ConnectivityIn the ever-evolving narrative of India's infrastructure advancement, the Delhi-Jaipur Expressway emerges not merely as a road but as a transformative force reshaping connectivity, commerce, and the future of regional development. A strategic segment...
          BS

          By Bharat

          Thu Jun 19 2025

          3 min read
        • Expressways in India: Completed, Ongoing & Upcoming Projects
          Expressways in India: Completed, Ongoing & Upcoming ProjectsIndia is witnessing a rapid transformation in its road infrastructure with the development of high-speed expressways connecting key cities and industrial corridors. These access-controlled highways are designed to boost connectivity, reduce travel ti...
          PV

          By Pratham

          Tue Jun 17 2025

          4 min read
        • Varanasi–Ranchi–Kolkata Expressway: All Villages & Route Details Revealed
          Varanasi–Ranchi–Kolkata Expressway: All Villages & Route Details RevealedA Seamless Link from Varanasi to Kolkata via Ranchi Now Taking ShapeThe Varanasi–Ranchi–Kolkata Expressway — also known as the Varanasi–Kolkata Expressway — is a major greenfield project under the Government of India’s ambitious Bharatmala Pariyojna....
          PV

          By Pratham

          Mon Jun 16 2025

          5 min read
        • Delhi-Mumbai Expressway Delay: Completion Expected in 2027
          Delhi-Mumbai Expressway Delay: Completion Expected in 2027IntroductionThe Delhi-Mumbai Expressway, India’s longest expressway under development, will take two more years to complete. The original deadline, March 2024, shifted earlier to October 2025, but current progress suggests final completion may not ha...
          PV

          By Pratham

          Fri Jun 13 2025

          3 min read
        • 701 Km Samruddhi Expressway Nears Completion, Final Stretch Ready
          701 Km Samruddhi Expressway Nears Completion, Final Stretch ReadyIntroductionThe Samruddhi Expressway, now fully connected, links Mumbai to Nagpur through a 701-kilometre high-speed corridor. The last 76-km section, between Igatpuri and Amane, is now operational—marking the project's completion.Final Section: Buil...
          PV

          By Pratham

          Thu Jun 12 2025

          3 min read
        • Yamuna Expressway: Features, Tolls, and Top Travel Tips
          Yamuna Expressway: Features, Tolls, and Top Travel TipsThe Yamuna Expressway, also known as the Taj Expressway, is a 165.5-kilometre-long, six-lane (expandable to eight) access-controlled expressway connecting Pari Chowk in Greater Noida to Kuberpur near Agra. Since its inauguration on 9 August 2012, the...
          PV

          By Pratham

          Thu Jun 12 2025

          4 min read
        Latest News
        *Prices are indicative and subject to change.
        91Infra

        91Infra is a rapidly growing digital platform that provides the latest updates and detailed information about the infrastructure and construction equipment industry.

        Our Partner Website

        91trucks.com
        91tractors.com
        Get Connected