MAHINDRA Earthmaster SX IV
  • +14 Images

MAHINDRA Earthmaster SX IV

0(0 Reviews)

MAHINDRA Earthmaster SX IV is available in the India market with an ex-showroom price of ₹31.00 Lakh. MAHINDRA Earthmaster SX IV comes with 3532 CC,345 NM,2.6.

₹31.00 Lakh*

View Price Breakup

EMI starts @

₹57,916/Month*

Ex-showroom price in

MAHINDRA Earthmaster SX IV

EMI starts @

₹57,916/Month*

  • Earthmaster SX IV
  • Price
  • Variants
  • Images
  • Specs
  • Reviews
  • Q&A
  • Videos
  • EMI
  • Brochure

MAHINDRA Earthmaster SX IV Construction Equipments Specs & Features

  • 3532 CC
    Displacement
  • 345 NM
    Maximum Torque
  • 2.6
    Bucket Capacity

MAHINDRA Earthmaster SX IV Construction Equipments Overview

MAHINDRA Earthmaster SX IV Construction Equipments Engine

MAHINDRA Earthmaster SX IV is powered by 3532 CC , 345 NM and 2.6

MAHINDRA Earthmaster SX IV Latest Price in India 2025

MAHINDRA Earthmaster SX IV is available in India starting from ₹31.00 Lakh

MAHINDRA Earthmaster SX IV Alternatives & Competitors

Main rival Construction Equipments of MAHINDRA Earthmaster SX IV are JCB 3DX, JCB 3DX Plus, MAHINDRA Earthmaster SX, MAHINDRA SX 4WD, CAT 424 and CASE 770 EX

Keep reading to explore more about MAHINDRA Earthmaster SX IV's updated specs, latest prices, horsepower, genuine user reviews, exclusive images, best offers near you, Construction Equipments dealers.

MAHINDRA Earthmaster SX IV Variant Price Range
Base ₹31.00 Lakh

Read More

MAHINDRA Earthmaster SX IV Price List Variants

MAHINDRA Earthmaster SX IV Images

  • MAHINDRA Earthmaster SX IV

    MAHINDRA Earthmaster SX IV

  • MAHINDRA Earthmaster SX IV

    MAHINDRA Earthmaster SX IV

  • MAHINDRA Earthmaster SX IV

    MAHINDRA Earthmaster SX IV

  • MAHINDRA Earthmaster SX IV

    MAHINDRA Earthmaster SX IV

  • MAHINDRA Earthmaster SX IV

    MAHINDRA Earthmaster SX IV

    • MAHINDRA Earthmaster SX IV
    • MAHINDRA Earthmaster SX IV
    • MAHINDRA Earthmaster SX IV
    • MAHINDRA Earthmaster SX IV

      +5

MAHINDRA Earthmaster SX IV Specifications

  • Engine
  • Loader General Dimension
  • Backhoe Loader Dimension
  • Overall Dimension & Weight
  • Hydraulic system
  • Service Capacities
  • Axle
  • Steering
  • Brakes
  • Power Train
  • General
Engine
ModelVNEF 3.5 L Turbocharged Intercooled
CompliantBS IV
Displacement3532 CC
Gross Power74 hp
Maximum Torque345 NM
Loader General Dimension
Dump Height2708 mm
Load Over Height3253 mm
Reach At Ground1350 MM
Max Reach At Full Height1115 mm
Max Reach At Full Height Bucket Dumped1115
Bucket Capacity Std1.1
Bucket Breakout Force6243 kg
Loader Arm Breakout Force5594 kg
Backhoe Loader Dimension
Max Dig Depth4959 mm
Reach Ground Level To Swing Center5794 mm
Reach At Full Height To Slew Center2774 mm
Max Working Height6043 mm
Max Load Over Height4131 mm
Bucket Capacity2.6
Bucket Capacity Backhoe1.1
Max Lift Capacity3428 Kg
Overall Dimension & Weight
Max Operating Weight7584
Hydraulic system
Pump TypeFixed displacement, Gear Pump,
Pump Flow117 l/min
TypeOpen Centre: 25 Mpa
Service Capacities
Engine Oil13.7
Rear Axle17.10 Ltr
Fuel Tank140 L
Coolant17 Ltr
Hydraulic Oil100
Transmission Oil Capacity19.20 Ltr
Axle
RearRigidly mounted drive axle, with outbound planetary final drives, driven by short drive shaft.
FrontCentrally pivoted, non-driven unbalanced type axle, with total oscillation of 16C, with remote greasing facility for the main pin.
Steering
TypeHydraulic Power Steering
Brakes
ServiceHydraulically actuated, self adjusting, maintenance free, oil immersed multi-disc, on the rear axle, operated by independent foot pedals, joined together for normal operation.
ParkingHand operated mechanically actuated caliper type brake
Power Train
Transmission Make And ModelFour Speed 4 Forward, 4 Reverse
General
CategoryBackhoe Loader

Compare MAHINDRA Earthmaster SX IV with Competitors

MAHINDRA Earthmaster SX IV User Reviews

MAHINDRA Earthmaster SX IV User Review

Be The First to Rate

      Have a question in your mind about MAHINDRA Earthmaster SX IV ?

      Get your answer from expert and users

      QNA

        MAHINDRA Earthmaster SX IV EMI Calculator

        EMI ₹57,916 per month

        Loan Amount

        Interest Amount

        0

        ₹31,00,000

        7%

        18%

        Time Period (in years)

        1 year

        7 year

        ₹27,90,000

        ₹6,84,949

        ₹34,74,949

        EMI starting at

        ₹57,916 /month*

        MAHINDRA Earthmaster SX IV Brochure

        Download MAHINDRA Earthmaster SX IV Brochure to check more details.

        Explore More Options

        • Dealers

          Connect with trusted dealers for the best offers

        • Comparison

          Compare vehicle side by side and choose the best

        Latest News

        • Telangana Seeks Fast Approval for RRR, Amaravati Expressway
          Telangana Seeks Fast Approval for RRR, Amaravati ExpresswayIn a decisive move underscoring Telangana's infrastructure ambitions, the state government has intensified its appeal to the Centre for expeditious clearance of two transformative road projects — the Regional Ring Road (RRR) and the Hyderabad-Amarava...
          BS

          By Bharat

          Wed Jun 25 2025

          5 min read
        • Mumbai-Goa Highway to Be Finished by June 2025
          Mumbai-Goa Highway to Be Finished by June 2025The long-standing infrastructure endeavour known as the Mumbai-Goa Highway is poised for completion by June 2025, ushering in a new era of regional integration and economic acceleration along India’s western coastline. With several critical segments...
          BS

          By Bharat

          Tue Jun 24 2025

          3 min read
        • Delhi-Mumbai Expressway's 8-Lane Tunnel Nears Completion
          Delhi-Mumbai Expressway's 8-Lane Tunnel Nears CompletionThe Delhi-Mumbai Expressway is close to marking a major achievement with the upcoming completion of its 8-lane tunnel. Built near Sohna in Haryana, this tunnel is set to become the widest road tunnel in India, forming a vital segment of the Delhi Exp...
          BS

          By Bharat

          Mon Jun 23 2025

          3 min read
        • Gorakhpur Link Expressway Opens: Faster, Smoother Travel Begins
          Gorakhpur Link Expressway Opens: Faster, Smoother Travel BeginsA Landmark Milestone in Eastern UP’s Road InfrastructureWith a formal inauguration on June 20, 2025, the long-anticipated Gorakhpur Link Expressway has finally opened to the public. This 91.35 km marvel of engineering is not just a road; it is a life...
          BS

          By Bharat

          Fri Jun 20 2025

          6 min read
        • Delhi-Jaipur Expressway: A New Era of Connectivity
          Delhi-Jaipur Expressway: A New Era of ConnectivityIn the ever-evolving narrative of India's infrastructure advancement, the Delhi-Jaipur Expressway emerges not merely as a road but as a transformative force reshaping connectivity, commerce, and the future of regional development. A strategic segment...
          BS

          By Bharat

          Thu Jun 19 2025

          3 min read
        • Expressways in India: Completed, Ongoing & Upcoming Projects
          Expressways in India: Completed, Ongoing & Upcoming ProjectsIndia is witnessing a rapid transformation in its road infrastructure with the development of high-speed expressways connecting key cities and industrial corridors. These access-controlled highways are designed to boost connectivity, reduce travel ti...
          PV

          By Pratham

          Tue Jun 17 2025

          4 min read
        • Varanasi–Ranchi–Kolkata Expressway: All Villages & Route Details Revealed
          Varanasi–Ranchi–Kolkata Expressway: All Villages & Route Details RevealedA Seamless Link from Varanasi to Kolkata via Ranchi Now Taking ShapeThe Varanasi–Ranchi–Kolkata Expressway — also known as the Varanasi–Kolkata Expressway — is a major greenfield project under the Government of India’s ambitious Bharatmala Pariyojna....
          PV

          By Pratham

          Mon Jun 16 2025

          5 min read
        • Delhi-Mumbai Expressway Delay: Completion Expected in 2027
          Delhi-Mumbai Expressway Delay: Completion Expected in 2027IntroductionThe Delhi-Mumbai Expressway, India’s longest expressway under development, will take two more years to complete. The original deadline, March 2024, shifted earlier to October 2025, but current progress suggests final completion may not ha...
          PV

          By Pratham

          Fri Jun 13 2025

          3 min read
        • 701 Km Samruddhi Expressway Nears Completion, Final Stretch Ready
          701 Km Samruddhi Expressway Nears Completion, Final Stretch ReadyIntroductionThe Samruddhi Expressway, now fully connected, links Mumbai to Nagpur through a 701-kilometre high-speed corridor. The last 76-km section, between Igatpuri and Amane, is now operational—marking the project's completion.Final Section: Buil...
          PV

          By Pratham

          Thu Jun 12 2025

          3 min read
        • Yamuna Expressway: Features, Tolls, and Top Travel Tips
          Yamuna Expressway: Features, Tolls, and Top Travel TipsThe Yamuna Expressway, also known as the Taj Expressway, is a 165.5-kilometre-long, six-lane (expandable to eight) access-controlled expressway connecting Pari Chowk in Greater Noida to Kuberpur near Agra. Since its inauguration on 9 August 2012, the...
          PV

          By Pratham

          Thu Jun 12 2025

          4 min read
        Latest News
        *Prices are indicative and subject to change.
        91Infra

        91Infra is a rapidly growing digital platform that provides the latest updates and detailed information about the infrastructure and construction equipment industry.

        Our Partner Website

        91trucks.com
        91tractors.com
        Get Connected