JCB 930
  • +1 Images

JCB 930

0(0 Reviews)

JCB 930 is available in the India market with an ex-showroom price of . JCB 930 comes with Diesel,74 HP,0.18 cu.m,400 Nm.

Price coming soon*

View Price Breakup

EMI starts @

*****/month*

Ex-showroom price in

JCB 930

EMI starts @

*****/month*

  • 930
  • Price
  • Variants
  • Images
  • Specs
  • Reviews
  • Q&A
  • Videos
  • EMI
  • Brochure

JCB 930 Construction Equipments Specs & Features

  • Diesel
    Fuel Type
  • 74 HP
    Power
  • 0.18 cu.m
    Bucket Capacity
  • 400 Nm
    Maximum Torque

JCB 930 Latest Update

The 6 ton (6,340kg) JCB 930 RTFL is powered by our highly efficient 74hp (55kW) EcoMAX engine and has a 6,000lbs (2,722kg) lift capacity.It has several mast options available so you can tailor your 930 RTFL to the perfect lift height.

Read More

JCB 930 Construction Equipments Overview

JCB 930 Construction Equipments Engine

JCB 930 is powered by Diesel , 74 HP , 0.18 cu.m and 400 Nm

JCB 930 Latest Price in India 2025

JCB 930 is available in India starting from 0

JCB 930 Alternatives & Competitors

Main rival Construction Equipments of JCB 930 are JCB 2DX, JCB 4DX, ACE AX-124 NS, BULL CH76 Challenger, BULL HD 100 and JCB 3DX Plus

Keep reading to explore more about JCB 930's updated specs, latest prices, horsepower, genuine user reviews, exclusive images, best offers near you, Construction Equipments dealers.

JCB 930 Variant Price Range
Base

Read More

JCB 930 Price List Variants

JCB 930 Images

  • JCB 930

    JCB 930

JCB 930 Specifications

  • Engine
  • Brakes
  • General
  • Dimensions
  • Swing Mechanism
  • Tyres
  • Performance
  • Gear Box
Engine
Rating74 HP
Make ModelJCB ECOMAX TCAE-55
Brakes
Service TypeHydraulically activate
Parking TypeHand operated disc brake
General
CategoryForklift Truck
Lifting Load Capacity4535
Fuel TypeDiesel
Sub CategoryRough Terrain
Power74 HP
Dimensions
Lift Height22
Overall Width2133
Ground Clearance Mast254
Bucket Capacity0.18 cu.m
Swing Mechanism
Maximum Torque400 Nm
Tyres
Size Front15.5-25 (12 ply) 2WD, 15.5-25 (12 ply) 4WD
Size Rear12.5/80-18 (10 ply) 2WD, 14-17.5 (10 ply) 4WD
Wheel Base1828
Performance
Steering TypeHydrostatic
Gear Box
TransmissionSyncroshuttle
No Of Speeds Fwd Rev4F/4R
Gear ShiftManual Shift

Compare JCB 930 with Competitors

JCB 930 User Reviews

JCB 930 User Review

Be The First to Rate

      Have a question in your mind about JCB 930 ?

      Get your answer from expert and users

      QNA

        JCB 930 Brochure

        Download JCB 930 Brochure to check more details.

        Explore More Options

        • Dealers

          Connect with trusted dealers for the best offers

        • Comparison

          Compare vehicle side by side and choose the best

        Latest News

        • Telangana Seeks Fast Approval for RRR, Amaravati Expressway
          Telangana Seeks Fast Approval for RRR, Amaravati ExpresswayIn a decisive move underscoring Telangana's infrastructure ambitions, the state government has intensified its appeal to the Centre for expeditious clearance of two transformative road projects — the Regional Ring Road (RRR) and the Hyderabad-Amarava...
          BS

          By Bharat

          Wed Jun 25 2025

          5 min read
        • Mumbai-Goa Highway to Be Finished by June 2025
          Mumbai-Goa Highway to Be Finished by June 2025The long-standing infrastructure endeavour known as the Mumbai-Goa Highway is poised for completion by June 2025, ushering in a new era of regional integration and economic acceleration along India’s western coastline. With several critical segments...
          BS

          By Bharat

          Tue Jun 24 2025

          3 min read
        • Delhi-Mumbai Expressway's 8-Lane Tunnel Nears Completion
          Delhi-Mumbai Expressway's 8-Lane Tunnel Nears CompletionThe Delhi-Mumbai Expressway is close to marking a major achievement with the upcoming completion of its 8-lane tunnel. Built near Sohna in Haryana, this tunnel is set to become the widest road tunnel in India, forming a vital segment of the Delhi Exp...
          BS

          By Bharat

          Mon Jun 23 2025

          3 min read
        • Gorakhpur Link Expressway Opens: Faster, Smoother Travel Begins
          Gorakhpur Link Expressway Opens: Faster, Smoother Travel BeginsA Landmark Milestone in Eastern UP’s Road InfrastructureWith a formal inauguration on June 20, 2025, the long-anticipated Gorakhpur Link Expressway has finally opened to the public. This 91.35 km marvel of engineering is not just a road; it is a life...
          BS

          By Bharat

          Fri Jun 20 2025

          6 min read
        • Delhi-Jaipur Expressway: A New Era of Connectivity
          Delhi-Jaipur Expressway: A New Era of ConnectivityIn the ever-evolving narrative of India's infrastructure advancement, the Delhi-Jaipur Expressway emerges not merely as a road but as a transformative force reshaping connectivity, commerce, and the future of regional development. A strategic segment...
          BS

          By Bharat

          Thu Jun 19 2025

          3 min read
        • Expressways in India: Completed, Ongoing & Upcoming Projects
          Expressways in India: Completed, Ongoing & Upcoming ProjectsIndia is witnessing a rapid transformation in its road infrastructure with the development of high-speed expressways connecting key cities and industrial corridors. These access-controlled highways are designed to boost connectivity, reduce travel ti...
          PV

          By Pratham

          Tue Jun 17 2025

          4 min read
        • Varanasi–Ranchi–Kolkata Expressway: All Villages & Route Details Revealed
          Varanasi–Ranchi–Kolkata Expressway: All Villages & Route Details RevealedA Seamless Link from Varanasi to Kolkata via Ranchi Now Taking ShapeThe Varanasi–Ranchi–Kolkata Expressway — also known as the Varanasi–Kolkata Expressway — is a major greenfield project under the Government of India’s ambitious Bharatmala Pariyojna....
          PV

          By Pratham

          Mon Jun 16 2025

          5 min read
        • Delhi-Mumbai Expressway Delay: Completion Expected in 2027
          Delhi-Mumbai Expressway Delay: Completion Expected in 2027IntroductionThe Delhi-Mumbai Expressway, India’s longest expressway under development, will take two more years to complete. The original deadline, March 2024, shifted earlier to October 2025, but current progress suggests final completion may not ha...
          PV

          By Pratham

          Fri Jun 13 2025

          3 min read
        • 701 Km Samruddhi Expressway Nears Completion, Final Stretch Ready
          701 Km Samruddhi Expressway Nears Completion, Final Stretch ReadyIntroductionThe Samruddhi Expressway, now fully connected, links Mumbai to Nagpur through a 701-kilometre high-speed corridor. The last 76-km section, between Igatpuri and Amane, is now operational—marking the project's completion.Final Section: Buil...
          PV

          By Pratham

          Thu Jun 12 2025

          3 min read
        • Yamuna Expressway: Features, Tolls, and Top Travel Tips
          Yamuna Expressway: Features, Tolls, and Top Travel TipsThe Yamuna Expressway, also known as the Taj Expressway, is a 165.5-kilometre-long, six-lane (expandable to eight) access-controlled expressway connecting Pari Chowk in Greater Noida to Kuberpur near Agra. Since its inauguration on 9 August 2012, the...
          PV

          By Pratham

          Thu Jun 12 2025

          4 min read
        Latest News
        *Prices are indicative and subject to change.
        91Infra

        91Infra is a rapidly growing digital platform that provides the latest updates and detailed information about the infrastructure and construction equipment industry.

        Our Partner Website

        91trucks.com
        91tractors.com
        Get Connected