HYUNDAI R30Z-9AK
  • +1 Images

HYUNDAI R30Z-9AK

0(0 Reviews)

HYUNDAI R30Z-9AK is available in the India market with an ex-showroom price of . HYUNDAI R30Z-9AK comes with 1261 cc,24.9 Hp,30 Ltr.

Price coming soon*

View Price Breakup

EMI starts @

*****/month*

Ex-showroom price in

HYUNDAI R30Z-9AK

EMI starts @

*****/month*

  • R30Z-9AK
  • Price
  • Variants
  • Images
  • Specs
  • Reviews
  • Q&A
  • Videos
  • EMI
  • Brochure

HYUNDAI R30Z-9AK Construction Equipments Specs & Features

  • 1261 cc
    Displacement
  • 24.9 Hp
    Power
  • 30 Ltr
    Fuel Tank Capacity

HYUNDAI R30Z-9AK Construction Equipments Overview

HYUNDAI R30Z-9AK Construction Equipments Engine

HYUNDAI R30Z-9AK is powered by 1261 cc , 24.9 Hp and 30 Ltr

HYUNDAI R30Z-9AK Latest Price in India 2025

HYUNDAI R30Z-9AK is available in India starting from 0

HYUNDAI R30Z-9AK Alternatives & Competitors

Main rival Construction Equipments of HYUNDAI R30Z-9AK are JCB 3DX, JCB 4DX, ACE AX-124, ACE AX-124 4WD, BOBCAT B900 and CAT 424

Keep reading to explore more about HYUNDAI R30Z-9AK's updated specs, latest prices, horsepower, genuine user reviews, exclusive images, best offers near you, Construction Equipments dealers.

HYUNDAI R30Z-9AK Variant Price Range
Base

Read More

HYUNDAI R30Z-9AK Price List Variants

HYUNDAI R30Z-9AK Images

  • HYUNDAI R30Z-9AK

    HYUNDAI R30Z-9AK

HYUNDAI R30Z-9AK Specifications

  • Engine
  • Hydraulic system
  • General
  • Dimensions
  • Weights
  • Working Ranges & Forces
  • Service Refill Capacities
Engine
ModelKubota D1305
Displacement1261 cc
Power24.9Hp
Net Power Iso 924924.9 HP
Bore78
Stroke88
Hydraulic system
Main Maximum Flow47.2
General
CategoryExcavator
Sub CategoryMini
Dimensions
Boom2030
Ground Clearance290
Track Gauge1250
Counterweight Clearance510
Tail Swing Radius775
Track Length1970
Weights
Operating Weight2895
Fuel Tank Capacity30Ltr
Engine Oil5.9
Hydraulic Tank27
Cooling29.5
Working Ranges & Forces
Maximum Digging Depth2720
Bucket Capacity0.08
Maximum Reach At Ground Level4515
Maximum Vertical Wall Digging Depth2310
Lifting Capacity550
Service Refill Capacities
Hydraulic27 Ltr

Compare HYUNDAI R30Z-9AK with Competitors

HYUNDAI R30Z-9AK User Reviews

HYUNDAI R30Z-9AK User Review

Be The First to Rate

      Have a question in your mind about HYUNDAI R30Z-9AK ?

      Get your answer from expert and users

      QNA

        HYUNDAI R30Z-9AK Brochure

        Download HYUNDAI R30Z-9AK Brochure to check more details.

        Explore More Options

        • Dealers

          Connect with trusted dealers for the best offers

        • Comparison

          Compare vehicle side by side and choose the best

        Latest News

        • Telangana Seeks Fast Approval for RRR, Amaravati Expressway
          Telangana Seeks Fast Approval for RRR, Amaravati ExpresswayIn a decisive move underscoring Telangana's infrastructure ambitions, the state government has intensified its appeal to the Centre for expeditious clearance of two transformative road projects — the Regional Ring Road (RRR) and the Hyderabad-Amarava...
          BS

          By Bharat

          Wed Jun 25 2025

          5 min read
        • Mumbai-Goa Highway to Be Finished by June 2025
          Mumbai-Goa Highway to Be Finished by June 2025The long-standing infrastructure endeavour known as the Mumbai-Goa Highway is poised for completion by June 2025, ushering in a new era of regional integration and economic acceleration along India’s western coastline. With several critical segments...
          BS

          By Bharat

          Tue Jun 24 2025

          3 min read
        • Delhi-Mumbai Expressway's 8-Lane Tunnel Nears Completion
          Delhi-Mumbai Expressway's 8-Lane Tunnel Nears CompletionThe Delhi-Mumbai Expressway is close to marking a major achievement with the upcoming completion of its 8-lane tunnel. Built near Sohna in Haryana, this tunnel is set to become the widest road tunnel in India, forming a vital segment of the Delhi Exp...
          BS

          By Bharat

          Mon Jun 23 2025

          3 min read
        • Gorakhpur Link Expressway Opens: Faster, Smoother Travel Begins
          Gorakhpur Link Expressway Opens: Faster, Smoother Travel BeginsA Landmark Milestone in Eastern UP’s Road InfrastructureWith a formal inauguration on June 20, 2025, the long-anticipated Gorakhpur Link Expressway has finally opened to the public. This 91.35 km marvel of engineering is not just a road; it is a life...
          BS

          By Bharat

          Fri Jun 20 2025

          6 min read
        • Delhi-Jaipur Expressway: A New Era of Connectivity
          Delhi-Jaipur Expressway: A New Era of ConnectivityIn the ever-evolving narrative of India's infrastructure advancement, the Delhi-Jaipur Expressway emerges not merely as a road but as a transformative force reshaping connectivity, commerce, and the future of regional development. A strategic segment...
          BS

          By Bharat

          Thu Jun 19 2025

          3 min read
        • Expressways in India: Completed, Ongoing & Upcoming Projects
          Expressways in India: Completed, Ongoing & Upcoming ProjectsIndia is witnessing a rapid transformation in its road infrastructure with the development of high-speed expressways connecting key cities and industrial corridors. These access-controlled highways are designed to boost connectivity, reduce travel ti...
          PV

          By Pratham

          Tue Jun 17 2025

          4 min read
        • Varanasi–Ranchi–Kolkata Expressway: All Villages & Route Details Revealed
          Varanasi–Ranchi–Kolkata Expressway: All Villages & Route Details RevealedA Seamless Link from Varanasi to Kolkata via Ranchi Now Taking ShapeThe Varanasi–Ranchi–Kolkata Expressway — also known as the Varanasi–Kolkata Expressway — is a major greenfield project under the Government of India’s ambitious Bharatmala Pariyojna....
          PV

          By Pratham

          Mon Jun 16 2025

          5 min read
        • Delhi-Mumbai Expressway Delay: Completion Expected in 2027
          Delhi-Mumbai Expressway Delay: Completion Expected in 2027IntroductionThe Delhi-Mumbai Expressway, India’s longest expressway under development, will take two more years to complete. The original deadline, March 2024, shifted earlier to October 2025, but current progress suggests final completion may not ha...
          PV

          By Pratham

          Fri Jun 13 2025

          3 min read
        • 701 Km Samruddhi Expressway Nears Completion, Final Stretch Ready
          701 Km Samruddhi Expressway Nears Completion, Final Stretch ReadyIntroductionThe Samruddhi Expressway, now fully connected, links Mumbai to Nagpur through a 701-kilometre high-speed corridor. The last 76-km section, between Igatpuri and Amane, is now operational—marking the project's completion.Final Section: Buil...
          PV

          By Pratham

          Thu Jun 12 2025

          3 min read
        • Yamuna Expressway: Features, Tolls, and Top Travel Tips
          Yamuna Expressway: Features, Tolls, and Top Travel TipsThe Yamuna Expressway, also known as the Taj Expressway, is a 165.5-kilometre-long, six-lane (expandable to eight) access-controlled expressway connecting Pari Chowk in Greater Noida to Kuberpur near Agra. Since its inauguration on 9 August 2012, the...
          PV

          By Pratham

          Thu Jun 12 2025

          4 min read
        Latest News
        *Prices are indicative and subject to change.
        91Infra

        91Infra is a rapidly growing digital platform that provides the latest updates and detailed information about the infrastructure and construction equipment industry.

        Our Partner Website

        91trucks.com
        91tractors.com
        Get Connected