CAT 330 GC
  • +1 Images

CAT 330 GC

0(0 Reviews)

CAT 330 GC is available in the India market with an ex-showroom price of . CAT 330 GC comes with 7.01 L,213 Hp,105 kN·m,474 Ltr.

Price coming soon*

View Price Breakup

EMI starts @

*****/month*

Ex-showroom price in

CAT 330 GC

EMI starts @

*****/month*

  • 330 GC
  • Price
  • Variants
  • Images
  • Specs
  • Reviews
  • Q&A
  • Videos
  • EMI
  • Brochure

CAT 330 GC Construction Equipments Specs & Features

  • 7.01 L
    Displacement
  • 213 Hp
    Power
  • 105 kN·m
    Maximum Torque
  • 474 Ltr
    Fuel Tank Capacity

CAT 330 GC Construction Equipments Overview

CAT 330 GC Construction Equipments Engine

CAT 330 GC is powered by 7.01 L , 213 Hp, 105 kN·m and 474 Ltr

CAT 330 GC Latest Price in India 2025

CAT 330 GC is available in India starting from 0

CAT 330 GC Alternatives & Competitors

Main rival Construction Equipments of CAT 330 GC are ACE AX-130, ACE AX-124, ACE AX-124 4WD, ACE AX-124 NS, BULL CH76 Challenger and BULL HD 100

Keep reading to explore more about CAT 330 GC's updated specs, latest prices, horsepower, genuine user reviews, exclusive images, best offers near you, Construction Equipments dealers.

CAT 330 GC Variant Price Range
Base

Read More

CAT 330 GC Price List Variants

CAT 330 GC Images

  • CAT 330 GC

    CAT 330 GC

CAT 330 GC Specifications

  • Engine
  • Hydraulic system
  • General
  • Dimensions
  • Swing Mechanism
  • Weights
  • Working Ranges & Forces
  • Boom
Engine
ModelCat C7.1
Displacement7.01 L
Power213Hp
Net Power Iso 9249212 Hp
Bore105 mm
Stroke135
Power Iso 14396213 Hp
Hydraulic system
Main Maximum Flow560
Maximum Pressure Equipment35000
Maximum Pressure Travel35000
Maximum Pressure Swing28400
General
CategoryExcavator
Sub CategoryMedium
Cylinder Store1646
Cylinder Bore135
Dimensions
Ground Clearance490
Track Gauge2590
Counterweight Clearance1110
Tail Swing Radius3130
Track Length4850
Length To Center Of Rollers3990
Swing Mechanism
Speed11.5 Rpm
Maximum Torque105 kN·m
Weights
Operating Weight28900
Fuel Tank Capacity474Ltr
Engine Oil25
Hydraulic Tank147
Hydraulic Including Tank310
Cooling25
Swing Drive10
Final Drive5.5
Working Ranges & Forces
Maximum Digging Depth7260
Bucket Capacity1.6
Maximum Cutting Height9880
Maximum Vertical Wall Digging Depth5510
Bucket Digging Force Iso179 kN
Stick Digging Force Iso145 kN
Boom
Cylinder Bore140
Cylinder Store1407

Compare CAT 330 GC with Competitors

CAT 330 GC User Reviews

CAT 330 GC User Review

Be The First to Rate

      Have a question in your mind about CAT 330 GC ?

      Get your answer from expert and users

      QNA

        CAT 330 GC Brochure

        Download CAT 330 GC Brochure to check more details.

        Explore More Options

        • Dealers

          Connect with trusted dealers for the best offers

        • Comparison

          Compare vehicle side by side and choose the best

        Latest News

        • Telangana Seeks Fast Approval for RRR, Amaravati Expressway
          Telangana Seeks Fast Approval for RRR, Amaravati ExpresswayIn a decisive move underscoring Telangana's infrastructure ambitions, the state government has intensified its appeal to the Centre for expeditious clearance of two transformative road projects — the Regional Ring Road (RRR) and the Hyderabad-Amarava...
          BS

          By Bharat

          Wed Jun 25 2025

          5 min read
        • Mumbai-Goa Highway to Be Finished by June 2025
          Mumbai-Goa Highway to Be Finished by June 2025The long-standing infrastructure endeavour known as the Mumbai-Goa Highway is poised for completion by June 2025, ushering in a new era of regional integration and economic acceleration along India’s western coastline. With several critical segments...
          BS

          By Bharat

          Tue Jun 24 2025

          3 min read
        • Delhi-Mumbai Expressway's 8-Lane Tunnel Nears Completion
          Delhi-Mumbai Expressway's 8-Lane Tunnel Nears CompletionThe Delhi-Mumbai Expressway is close to marking a major achievement with the upcoming completion of its 8-lane tunnel. Built near Sohna in Haryana, this tunnel is set to become the widest road tunnel in India, forming a vital segment of the Delhi Exp...
          BS

          By Bharat

          Mon Jun 23 2025

          3 min read
        • Gorakhpur Link Expressway Opens: Faster, Smoother Travel Begins
          Gorakhpur Link Expressway Opens: Faster, Smoother Travel BeginsA Landmark Milestone in Eastern UP’s Road InfrastructureWith a formal inauguration on June 20, 2025, the long-anticipated Gorakhpur Link Expressway has finally opened to the public. This 91.35 km marvel of engineering is not just a road; it is a life...
          BS

          By Bharat

          Fri Jun 20 2025

          6 min read
        • Delhi-Jaipur Expressway: A New Era of Connectivity
          Delhi-Jaipur Expressway: A New Era of ConnectivityIn the ever-evolving narrative of India's infrastructure advancement, the Delhi-Jaipur Expressway emerges not merely as a road but as a transformative force reshaping connectivity, commerce, and the future of regional development. A strategic segment...
          BS

          By Bharat

          Thu Jun 19 2025

          3 min read
        • Expressways in India: Completed, Ongoing & Upcoming Projects
          Expressways in India: Completed, Ongoing & Upcoming ProjectsIndia is witnessing a rapid transformation in its road infrastructure with the development of high-speed expressways connecting key cities and industrial corridors. These access-controlled highways are designed to boost connectivity, reduce travel ti...
          PV

          By Pratham

          Tue Jun 17 2025

          4 min read
        • Varanasi–Ranchi–Kolkata Expressway: All Villages & Route Details Revealed
          Varanasi–Ranchi–Kolkata Expressway: All Villages & Route Details RevealedA Seamless Link from Varanasi to Kolkata via Ranchi Now Taking ShapeThe Varanasi–Ranchi–Kolkata Expressway — also known as the Varanasi–Kolkata Expressway — is a major greenfield project under the Government of India’s ambitious Bharatmala Pariyojna....
          PV

          By Pratham

          Mon Jun 16 2025

          5 min read
        • Delhi-Mumbai Expressway Delay: Completion Expected in 2027
          Delhi-Mumbai Expressway Delay: Completion Expected in 2027IntroductionThe Delhi-Mumbai Expressway, India’s longest expressway under development, will take two more years to complete. The original deadline, March 2024, shifted earlier to October 2025, but current progress suggests final completion may not ha...
          PV

          By Pratham

          Fri Jun 13 2025

          3 min read
        • 701 Km Samruddhi Expressway Nears Completion, Final Stretch Ready
          701 Km Samruddhi Expressway Nears Completion, Final Stretch ReadyIntroductionThe Samruddhi Expressway, now fully connected, links Mumbai to Nagpur through a 701-kilometre high-speed corridor. The last 76-km section, between Igatpuri and Amane, is now operational—marking the project's completion.Final Section: Buil...
          PV

          By Pratham

          Thu Jun 12 2025

          3 min read
        • Yamuna Expressway: Features, Tolls, and Top Travel Tips
          Yamuna Expressway: Features, Tolls, and Top Travel TipsThe Yamuna Expressway, also known as the Taj Expressway, is a 165.5-kilometre-long, six-lane (expandable to eight) access-controlled expressway connecting Pari Chowk in Greater Noida to Kuberpur near Agra. Since its inauguration on 9 August 2012, the...
          PV

          By Pratham

          Thu Jun 12 2025

          4 min read
        Latest News
        *Prices are indicative and subject to change.
        91Infra

        91Infra is a rapidly growing digital platform that provides the latest updates and detailed information about the infrastructure and construction equipment industry.

        Our Partner Website

        91trucks.com
        91tractors.com
        Get Connected