JCB 3DX Plus
  • +1 Images

JCB 3DX Plus

5(0 Reviews)

JCB 3DX Plus is available in the India market with an ex-showroom price of ₹30.00 Lakh. JCB 3DX Plus comes with 74 HP,1 cu.m,400 Nm.

₹30.00 Lakh*

View Price Breakup

EMI starts @

₹56,048/Month*

Ex-showroom price in

EMI starts @

₹56,048/Month*

JCB 3DX Plus Construction Equipments Features

  • 74 HP
    Power
  • 1 cu.m
    Bucket Capacity
  • 400 Nm
    Maximum Torque

JCB 3DX Plus Latest Update

JCB 3DX Plus is a very popular name in the heavy construction equipment segment. JCB 3DX Plus is designed with segment best specification, which helps in providing better work efficiency. With its powerful engine and hydraulic system, the 3DX Plus is capable of performing a wide range of tasks with precision and efficiency. In addition, the JCB 3DX Plus fuel tank capacity is 128 Ltr. Its ample capacity guarantees prolonged operation intervals, eliminating the necessity for frequent refills. This enables operators to concentrate on their current tasks without any disruptions.

JCB 3DX Plus Price List Variants

JCB 3DX Plus Images

  • JCB 3DX Plus

JCB 3DX Plus Specifications

  • Engine
  • Loader General Dimension
  • Backhoe Loader Dimension
  • Overall Dimension & Weight
  • Hydraulic system
  • Service Capacities
  • Brakes
  • Tyre
  • General
  • Dimensions
  • Swing Mechanism
Engine
ModelJCB 444
CompliantCEV Stage lV
Gross Power55kW (74hp) @ 2200 rpm
Loader General Dimension
Dump Height2740 MM
Load Over Height3320 MM
Hinge Pin Height3540
Hinge Pin Forward Reach250
Reach At Ground1420
Max Reach At Full Height Bucket Dumped1150
Below Ground Level Dig Depth70
Rollback At Ground45 deg
Dump Angle38
Bucket Capacity Std0.26
Loader Arm Breakout Force5635 kgf
Max Pay Load1800
Backhoe Loader Dimension
Max Dig Depth4770 MM
Reach Ground Level To Rear Wheel Center6720
Reach At Full Height To Slew Center2740
Max Working Height5970
Max Load Over Height4180
Bucket Capacity Backhoe0.2
Bucket Rotation185 deg
Bucket Breakout Force5959 kgf
Dipper Tear Out Force3257 kgf
Max Lift Capacity1490 Kg
Overall Dimension & Weight
Max Operating Weight7510
Transport Length5900
Width Over Bucket2350 MM
Track Width Rear1730 MM
Track Width Front1860 MM
Minimum Ground Clearance510
Height To Top Of Cabin2870 MM
Hydraulic system
Pump Flow114 lpm
Service Capacities
Rear Axle20 Ltr
Hydraulic Oil92
Transmission Oil Capacity17.5 Ltr
Brakes
ServiceJCB ‘Q’ brakes, hydraulically actuated, dual line, self adjusting (compensated), oil immersed, multi-disc type on the rear axle, well protected from dirt, water etc. requiring no maintenance. Operated
ParkingHand operated, disc brakes on rear axle input disc
Tyre
Standard Front9 x 16 - 16 PR
Standard Rear16.9 x 28 - 12 PR
General
CategoryBackhoe Loader
Power74 HP
Forward6.5/10.5/19.8/36
Reverse6.5/10.5
Dimensions
Bucket Capacity1 cu.m
Swing Mechanism
Maximum Torque400 Nm

JCB 3DX Plus Detailed Overview

    JCB 3DX Plus comes with an engine which generates 55kW (74hp) @ 2200 rpm and maximum torque of 400Nm @ 1200 rpm. In addition, this engine gives a new dimension to work output to this JCB 3DX Plus.

    Summary

    JCB 3DX Plus comes with an engine which generates 55kW (74hp) @ 2200 rpm and maximum torque of 400Nm @ 1200 rpm

    The JCB 3DX Plus backhoe loader boasts an impressive maximum lift capacity of 1490 Kg. It facilitates the effective loading and unloading of construction materials like gravel, sand, and concrete blocks.

    Summary

    The JCB 3DX Plus backhoe loader boasts an impressive maximum lift capacity of 1490 Kg.

Compare JCB 3DX Plus with Competitors

JCB 3DX Plus User Reviews

JCB 3DX Plus User Review

5(0 reviews)

      Have a question in your mind about JCB 3DX Plus ?

      Get your answer from expert and users

        JCB 3DX Plus EMI Calculator

        EMI ₹56,048 per month

        Loan Amount

        Interest Amount

        0

        ₹30,00,000

        7%

        18%

        Time Period (in years)

        1 year

        7 year

        ₹27,00,000

        ₹6,62,854

        ₹33,62,854

        EMI starting at

        ₹56,048 /month*

        JCB 3DX Plus Brochure

        Download JCB 3DX Plus Brochure to check more details.

        Explore More Options

        Latest News

        • Telangana Seeks Fast Approval for RRR, Amaravati ExpresswayIn a decisive move underscoring Telangana's infrastructure ambitions, the state government has intensified its appeal to the Centre for expeditious clearance of two transformative road projects — the Regional Ring Road (RRR) and the Hyderabad-Amarava...
          BS

          By Bharat

          Wed Jun 25 2025

          5 min read
        • Mumbai-Goa Highway to Be Finished by June 2025The long-standing infrastructure endeavour known as the Mumbai-Goa Highway is poised for completion by June 2025, ushering in a new era of regional integration and economic acceleration along India’s western coastline. With several critical segments...
          BS

          By Bharat

          Tue Jun 24 2025

          3 min read
        • Delhi-Mumbai Expressway's 8-Lane Tunnel Nears CompletionThe Delhi-Mumbai Expressway is close to marking a major achievement with the upcoming completion of its 8-lane tunnel. Built near Sohna in Haryana, this tunnel is set to become the widest road tunnel in India, forming a vital segment of the Delhi Exp...
          BS

          By Bharat

          Mon Jun 23 2025

          3 min read
        • Gorakhpur Link Expressway Opens: Faster, Smoother Travel BeginsA Landmark Milestone in Eastern UP’s Road InfrastructureWith a formal inauguration on June 20, 2025, the long-anticipated Gorakhpur Link Expressway has finally opened to the public. This 91.35 km marvel of engineering is not just a road; it is a life...
          BS

          By Bharat

          Fri Jun 20 2025

          6 min read
        • Delhi-Jaipur Expressway: A New Era of ConnectivityIn the ever-evolving narrative of India's infrastructure advancement, the Delhi-Jaipur Expressway emerges not merely as a road but as a transformative force reshaping connectivity, commerce, and the future of regional development. A strategic segment...
          BS

          By Bharat

          Thu Jun 19 2025

          3 min read
        • Expressways in India: Completed, Ongoing & Upcoming ProjectsIndia is witnessing a rapid transformation in its road infrastructure with the development of high-speed expressways connecting key cities and industrial corridors. These access-controlled highways are designed to boost connectivity, reduce travel ti...
          PV

          By Pratham

          Tue Jun 17 2025

          4 min read
        • Varanasi–Ranchi–Kolkata Expressway: All Villages & Route Details RevealedA Seamless Link from Varanasi to Kolkata via Ranchi Now Taking ShapeThe Varanasi–Ranchi–Kolkata Expressway — also known as the Varanasi–Kolkata Expressway — is a major greenfield project under the Government of India’s ambitious Bharatmala Pariyojna....
          PV

          By Pratham

          Mon Jun 16 2025

          5 min read
        • Delhi-Mumbai Expressway Delay: Completion Expected in 2027IntroductionThe Delhi-Mumbai Expressway, India’s longest expressway under development, will take two more years to complete. The original deadline, March 2024, shifted earlier to October 2025, but current progress suggests final completion may not ha...
          PV

          By Pratham

          Fri Jun 13 2025

          3 min read
        • 701 Km Samruddhi Expressway Nears Completion, Final Stretch ReadyIntroductionThe Samruddhi Expressway, now fully connected, links Mumbai to Nagpur through a 701-kilometre high-speed corridor. The last 76-km section, between Igatpuri and Amane, is now operational—marking the project's completion.Final Section: Buil...
          PV

          By Pratham

          Thu Jun 12 2025

          3 min read
        • Yamuna Expressway: Features, Tolls, and Top Travel TipsThe Yamuna Expressway, also known as the Taj Expressway, is a 165.5-kilometre-long, six-lane (expandable to eight) access-controlled expressway connecting Pari Chowk in Greater Noida to Kuberpur near Agra. Since its inauguration on 9 August 2012, the...
          PV

          By Pratham

          Thu Jun 12 2025

          4 min read
        Latest News
        *Prices are indicative and subject to change.
        91Infra

        91Infra is a rapidly growing digital platform that provides the latest updates and detailed information about the infrastructure and construction equipment industry.

        Our Partner Website

        Get Connected